Difference between revisions of "CH PAS Master Timeline"
Jump to navigation
Jump to search
(→June) |
|||
Line 6: | Line 6: | ||
=June= | =June= | ||
+ | |||
+ | ==6/22/21== | ||
+ | |||
+ | * Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul | ||
==6/25/21== | ==6/25/21== |
Revision as of 23:41, 25 June 2021
Timeline
This page will be used to document when each task is completed as a master reference for all work logged in the wiki. The plan is to make things easier when I need to pull things in the future.
May
June
6/22/21
- Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul
6/25/21
- Began BorAl attenuation measurements including overnight background runs