Difference between revisions of "CH Task List"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
==5/27/21== | ==5/27/21== | ||
− | + | '''To Do List''' | |
* Add dual timer configuration to plateau page (X) | * Add dual timer configuration to plateau page (X) | ||
Line 10: | Line 10: | ||
** Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github) | ** Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github) | ||
− | * NaI attenuation measurements (with BorAl and try different types of poly (unborated, | + | * NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead |
* Begin experimental setup in clean room (X) | * Begin experimental setup in clean room (X) | ||
Line 26: | Line 26: | ||
* Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X) | * Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X) | ||
− | ** Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this | + | ** Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X) |
* Finish 1100V source out data collection (X) | * Finish 1100V source out data collection (X) | ||
+ | |||
+ | * Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list | ||
+ | |||
+ | * Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X) | ||
+ | |||
+ | * Create wiki page for DD generator page | ||
+ | ** Include shielding papers and manuals -> will talk to Joe about this | ||
+ | |||
+ | * Paul got his tape measure unstuck from the clean room (X) | ||
+ | ** We're all very proud of him | ||
+ | |||
+ | ==6/10/21== | ||
+ | |||
+ | '''To Do List''' | ||
+ | |||
+ | * Finish attenuation measurements (X) and data analysis for He3 detector | ||
+ | ** Virgin poly (X) | ||
+ | |||
+ | * Continue experimental set up | ||
+ | |||
+ | * Model cradle for NaI detector for lead tube | ||
+ | |||
+ | * Talk to Roy Dunker about HPGe software (X) | ||
+ | ** Have CDs for the software, colleague will attempt to get it working | ||
* Rebuild computer with updated operating system and rebuilt with newest version of root | * Rebuild computer with updated operating system and rebuilt with newest version of root | ||
− | * | + | * Start MCNP simulations |
+ | |||
+ | |||
+ | |||
− | |||
− | |||
---- | ---- | ||
[[PAS_Experiment]] | [[PAS_Experiment]] |
Revision as of 18:01, 22 June 2021
Notes from biweekly meetings
5/27/21
To Do List
- Add dual timer configuration to plateau page (X)
- Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X)
- Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)
- NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
- Begin experimental setup in clean room (X)
- Test HPGe detector -> Work has begun on this by a colleague
- Complete latest assigned training module (X)
- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
- Move painted lead bricks to clean room (X)
- Linked manual for HPGe detector to wiki pages (X)
- Add files sent by collaborator on HPGe detector page
- Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
- Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
- Finish 1100V source out data collection (X)
- Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
- Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
- Create wiki page for DD generator page
- Include shielding papers and manuals -> will talk to Joe about this
- Paul got his tape measure unstuck from the clean room (X)
- We're all very proud of him
6/10/21
To Do List
- Finish attenuation measurements (X) and data analysis for He3 detector
- Virgin poly (X)
- Continue experimental set up
- Model cradle for NaI detector for lead tube
- Talk to Roy Dunker about HPGe software (X)
- Have CDs for the software, colleague will attempt to get it working
- Rebuild computer with updated operating system and rebuilt with newest version of root
- Start MCNP simulations