Difference between revisions of "CH Task List"

From New IAC Wiki
Jump to navigation Jump to search
Line 13: Line 13:
 
* Begin experimental setup in clean room (X)
 
* Begin experimental setup in clean room (X)
  
* Test HPGe detector
+
* Test HPGe detector -> Work has begun on this by a colleague
  
 
* Complete latest assigned training module (X)
 
* Complete latest assigned training module (X)
  
 
* Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
 
* Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
 
* How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)
 
  
 
* Move painted lead bricks to clean room (X)
 
* Move painted lead bricks to clean room (X)
Line 27: Line 25:
 
* Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify.  
 
* Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify.  
  
* Finish 1100V source out data collection  
+
* Finish 1100V source out data collection (X)
  
 
----
 
----
 
[[PAS_Experiment]]
 
[[PAS_Experiment]]

Revision as of 03:16, 5 June 2021

Notes from biweekly meetings

5/27/21

To do list

  • Add dual timer configuration to plateau page (X)
  • Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots
  • NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
  • Begin experimental setup in clean room (X)
  • Test HPGe detector -> Work has begun on this by a colleague
  • Complete latest assigned training module (X)
  • Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
  • Move painted lead bricks to clean room (X)
  • Linked manual for HPGe detector to wiki pages (X)
  • Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify.
  • Finish 1100V source out data collection (X)

PAS_Experiment