CH Task List: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Harpconn (talk | contribs)
No edit summary
Harpconn (talk | contribs)
Line 5: Line 5:
===To do list===
===To do list===


- Add dual timer configuration to plateau page (X)
* Add dual timer configuration to plateau page (X)


- Continue to fine tune operating point of NaI detector
* Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots


- NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
* NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))


- Begin experimental setup in clean room  
* Begin experimental setup in clean room  


- Find signal to noise ratio
* Find signal to noise ratio


- Test HPGe detector
* Test HPGe detector


- Complete latest assigned training module (X)
* Complete latest assigned training module (X)


- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
* Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
 
- How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)


* How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)


* Move painted lead bricks to clean room (X)




----
----
[[PAS_Experiment]]
[[PAS_Experiment]]

Revision as of 23:51, 1 June 2021

Notes from biweekly meetings

5/27/21

To do list

  • Add dual timer configuration to plateau page (X)
  • Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots
  • NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
  • Begin experimental setup in clean room
  • Find signal to noise ratio
  • Test HPGe detector
  • Complete latest assigned training module (X)
  • Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
  • How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)
  • Move painted lead bricks to clean room (X)



PAS_Experiment