CH Task List: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 24: | Line 24: | ||
{ | {| role="presentation" class="wikitable mw-collapsible" | ||
| | | <strong>Lorem ipsum</strong> | ||
| | |- | ||
| | | Lorem ipsum dolor sit amet | ||
} | |} | ||
---- | ---- | ||
[[PAS_Experiment]] | [[PAS_Experiment]] | ||
Revision as of 18:42, 1 June 2021
Notes from biweekly meetings
5/27/21
To do list
- Add dual timer configuration to plateau page
- Continue to fine tune operating point of NaI detector
- NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
- Begin experimental setup in clean room
- Find signal to noise ratio
- Test HPGe detector
- Complete latest assigned training module (X)
- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
- How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)
| Lorem ipsum |
| Lorem ipsum dolor sit amet |