Rates for Sector 1: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Vanwdani (talk | contribs)
No edit summary
Vanwdani (talk | contribs)
No edit summary
Line 3: Line 3:


[[File:Rates_Field_Material.png]]
[[File:Rates_Field_Material.png]]
All events for a run.  Sector crossing is possible.
All events for a run.  Sector crossing is possible.




[[File:PrimaryElectron_Rates_Field_Material.png]]
[[File:PrimaryElectron_Rates_Field_Material.png]]
All Primary Moller Electron events for a run within sector 1 only.
All Primary Moller Electron events for a run within sector 1 only.




[[File:SecondaryElectron_Rates_Field_Material.png]]
[[File:SecondaryElectron_Rates_Field_Material.png]]
All Secondary electron events for a run within sector 1 only.
All Secondary electron events for a run within sector 1 only.




[[File:Gamma_Rates_Field_Material.png]]
[[File:Gamma_Rates_Field_Material.png]]
All gamma events for a run within sector 1 only.
All gamma events for a run within sector 1 only.

Revision as of 04:14, 27 June 2018


All events for a run. Sector crossing is possible.



All Primary Moller Electron events for a run within sector 1 only.



All Secondary electron events for a run within sector 1 only.



All gamma events for a run within sector 1 only.