Difference between revisions of "09-07-2017"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
 
[[2nCor_44#Run_Plan]]
 
[[2nCor_44#Run_Plan]]
  
Line 26: Line 25:
 
| 6524 ||Integral= 280 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 54 degrees, lowered HV from 1450 to 1400 on both tubes. ||  ||  
 
| 6524 ||Integral= 280 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 54 degrees, lowered HV from 1450 to 1400 on both tubes. ||  ||  
 
|-
 
|-
| 6525 ||Integral= 280 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1400 to 1350 on bottom tube.  ||  ||  
+
| 6525 ||Integral= 270 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1400 to 1350 on bottom tube.  ||  ||  
 
|}
 
|}
  

Revision as of 18:39, 7 August 2017

2nCor_44#Run_Plan

Run list

Run # Charge/pulse Target Configuration Individual histos + rates overlayed histos
6510 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6511 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6512 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6513-6517 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6518 Integral= pV*s 260 mV peak = 1.1A MT 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz , Faraday cup in place
6519 Integral= pV*s 260 mV peak = 1.1A D20 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz, This D2O target is a vial and not the bottle used previously
6521 Integral= 255+-15 pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6522 Integral= 255 pV*s 260 mV peak = 1.1A MT 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6523 Integral= 260 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6524 Integral= 280 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 54 degrees, lowered HV from 1450 to 1400 on both tubes.
6525 Integral= 270 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1400 to 1350 on bottom tube.


2nCor_44#Run_Plan