Difference between revisions of "LB May 2017 Irradiation Day"

From New IAC Wiki
Jump to navigation Jump to search
Line 22: Line 22:
  
 
Timer to Start Counting:
 
Timer to Start Counting:
 +
 +
 +
==10% Se Soil Mix==
  
 
==Timing Cut Information for 50% Se Run (based on real Det B time)==
 
==Timing Cut Information for 50% Se Run (based on real Det B time)==

Revision as of 17:01, 23 May 2017

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


5/23/17

32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA

50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17 50%Se-Soil DetB Outer Se Det A 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa 09:43:36 23.6cm (DetB) pos10 (DetA)

Beam On:08:48 AM

Beam Off:

Timer to Start Counting:


10% Se Soil Mix

Timing Cut Information for 50% Se Run (based on real Det B time)

50%SeSoil_DetB_OuterSe_DetA_pos10.mpa

50% Soil Se: Start: 0 Stop: 500 s

Co-60 Flag 1: Start : 500s Stop : 600s

Outer Se : Start 602s Stop: 1000s

Co-60 Flag 2 : Start: 1000s Stop: 1051s

50% Mix : Start: 1051s Stop: 1577.050s

Co-60 Flag 3: Start: 1577.050s Stop: 1650s

Outer Se: Start: 1650s Stop: 2150s

Co-60 Flag 4: Start:2150s Stop 2240s

50% Se: Start:2240s Stop: 2740s

Co-60 Flag 5: Start:2740 Stop: 2827s

Outer Se : Start 2840s Stop: 3340s

Co-60 Flag 6: Start:3340s Stop: 3431s

50% Mix: Start: 3431s Stop: 3931s

Co-60 Flag 7: Start: 3931s Stop:4020s

Outer Se: Start: 4020s Stop: 4520s

Co-60 Flag 8: Start 4520s Stop: 4600s

50% Mix: Start: 4600s Stop: 5100s



32 MeV Beam 50 mA current 180Hz 2.2 us