Difference between revisions of "LB May 2017 Irradiation Day"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
| Date ||Sample || Document Title ||Start || Stop || Runtime (s) || Position | | Date ||Sample || Document Title ||Start || Stop || Runtime (s) || Position | ||
|- | |- | ||
− | ||5/23/17 || | + | ||5/23/17 || 50%Se-Soil DetB Outer Se Det A || 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa || 09:43:36 || || || |
|- | |- | ||
|} | |} |
Revision as of 15:46, 23 May 2017
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA
50% Se Soil Mix
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 | 50%Se-Soil DetB Outer Se Det A | 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa | 09:43:36 |
Beam On:08:48 AM
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)
32 MeV Beam 50 mA current 180Hz 2.2 us