32 MeV Beam 35 uA  current Pulse Width 2.2 us
+
 
  
 
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
 
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
Line 6: Line 6:
  
 
=5/23/17=
 
=5/23/17=
 +
 +
32 MeV Beam 50 mA  current
  
 
==50% Se Soil Mix==
 
==50% Se Soil Mix==
Line 23: Line 25:
  
 
Timing Cut Information for 50% Se Run (based on Det B time)
 
Timing Cut Information for 50% Se Run (based on Det B time)
 +
 +
32 MeV Beam 50 mA  current 180Hz 2.2 us

Revision as of 14:51, 23 May 2017


DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


5/23/17

32 MeV Beam 50 mA current

50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17

Beam On:08:48 AM

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on Det B time)

32 MeV Beam 50 mA current 180Hz 2.2 us