LB May 2017 Irradiation Day: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| Line 4: | Line 4: | ||
=5/23/17= | |||
==50% Se Soil Mix== | ==50% Se Soil Mix== | ||
Revision as of 14:23, 23 May 2017
32 MeV Beam 100 mA current Pulse Width 2.2 us
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
50% Se Soil Mix
| Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
| 5/23/17 |
Beam On:
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)