Difference between revisions of "LB May 2017 Irradiation Day"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
 
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
 
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
 +
  
  
Line 12: Line 13:
 
|-
 
|-
 
|}
 
|}
 +
 +
Beam On:
 +
 +
Beam Off:
 +
 +
Timer to Start Counting:
  
 
Timing Cut Information for 50% Se Run (based on Det B time)
 
Timing Cut Information for 50% Se Run (based on Det B time)

Revision as of 14:17, 23 May 2017

32 MeV Beam 100 mA current Pulse Width 2.2 us

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17

Beam On:

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on Det B time)