Difference between revisions of "LB May 2017 Irradiation Day"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482 | DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482 | ||
+ | |||
Line 12: | Line 13: | ||
|- | |- | ||
|} | |} | ||
+ | |||
+ | Beam On: | ||
+ | |||
+ | Beam Off: | ||
+ | |||
+ | Timer to Start Counting: | ||
Timing Cut Information for 50% Se Run (based on Det B time) | Timing Cut Information for 50% Se Run (based on Det B time) |
Revision as of 14:17, 23 May 2017
32 MeV Beam 100 mA current Pulse Width 2.2 us
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
50% Se Soil Mix
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 |
Beam On:
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)