LB May 2017 Irradiation Day: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Brenleyt (talk | contribs)
No edit summary
Brenleyt (talk | contribs)
No edit summary
Line 1: Line 1:
32 MeV Beam 100 mA current Pulse Width 2.2 us
32 MeV Beam 100 mA current Pulse Width 2.2 us
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482





Revision as of 14:17, 23 May 2017

32 MeV Beam 100 mA current Pulse Width 2.2 us

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17

Timing Cut Information for 50% Se Run (based on Det B time)