Difference between revisions of "LB May 2017 Irradiation Day"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
30 MeV Beam 1 uA current (possibly?)
+
32 MeV Beam 100 mA current Pulse Width 2.2 us
  
  

Revision as of 13:28, 23 May 2017

32 MeV Beam 100 mA current Pulse Width 2.2 us


50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17

Timing Cut Information for 50% Se Run (based on Det B time)