Difference between revisions of "Cf252 2017"
Jump to navigation
Jump to search
(Created page with "=runs= ==05/16/17== An OR between two 4 in. X 4 in. scintillators, placed 5 in above and below the Cf252 source, serve as the TDC start. The TDC start scintilators are connected…") |
|||
Line 1: | Line 1: | ||
=runs= | =runs= | ||
==05/16/17== | ==05/16/17== | ||
− | + | Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV. |
Revision as of 02:30, 17 May 2017
runs
05/16/17
Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV.