Difference between revisions of "05-2-2017"

From New IAC Wiki
Jump to navigation Jump to search
Line 28: Line 28:
 
! Run # !!Charge/pulse !!Target!! Configuration !! Individual histos + rates !!  overlayed histos !!  All PMT's no coinc.  
 
! Run # !!Charge/pulse !!Target!! Configuration !! Individual histos + rates !!  overlayed histos !!  All PMT's no coinc.  
 
|-
 
|-
| 6286||11. pV*s || '''Empty'''  ||  10.6 MeV , 3 ns FWHM pulse width , 1.4 A Peak , 180.4 Hz , Removed small Scint at .725 m Kept Scint in at 1.45 m,  ||  ||  ||  
+
| 6286||12.5 pV*s = 1.4A || '''Empty'''  ||  10.6 MeV , 3 ns FWHM pulse width , 1.4 A Peak , 180.4 Hz , Removed small Scint at .725 m Kept Scint in at 1.45 m,  ||  ||  ||  
 
|}
 
|}
  
  
 
[[2nCor_44#Run_Plan]]
 
[[2nCor_44#Run_Plan]]

Revision as of 13:17, 3 May 2017

Electronics map for the two auxiliary scintillators

Phi Angle (Degrees) PMT distance Signal cable label HV cable label HV channel on Lecroy Mainframe CFD CH VNIM-ECL channel ROOT variable
~282 m 102B1.2 shv1.2 5:L1.2 1 (left) B-0 evt.TDC[1][25]
~282 m 282T1.7 shv1.7 5:L1.7 2 (left) B-1 evt.TDC[1][26]


run list

Amps/(pV*s)=1.4/12.5=0.112

He-3 timing is in patch panel 223A16, & energy is 223A17.

High voltage & discriminator settings:

30T: 1450;30 , 30B:1450;30 , 54T: 1500;30 , 54B: 1500;30 , 78T:1500;30 , 78B: 1525;30 , 126T: 1500;30 , 126B: 1500;30 , 150T: 1500;40 , 150B: 1500;40 , 210T: 1500;40 , 210B: 1500;40 , 234T: 1500;30 , 234B: 1500;30 , 258T: 1350;30, 258B: 1450;30 , 306T: 1400;30 , 306B: 1400;30 , 330T: 1450;30 , 330B: 1500;30

Radiator 1.5" Al.

Slits currently at 500 => 19 mm, at 75 =0, at 1000=38 mm, readback number is linear with slit width.

Small aux. scintillators have a CFD threshold of 0.550 V for run 6274 and later.

Run # Charge/pulse Target Configuration Individual histos + rates overlayed histos All PMT's no coinc.
6286 12.5 pV*s = 1.4A Empty 10.6 MeV , 3 ns FWHM pulse width , 1.4 A Peak , 180.4 Hz , Removed small Scint at .725 m Kept Scint in at 1.45 m,


2nCor_44#Run_Plan