Difference between revisions of "LB April Efficiency Calculations"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
| Run || Source || Energy (keV) || Position || Expected Rate (Hz) ||ROOT Window || HpGe Rate (Hz) || Detector B Efficiency (%) | | Run || Source || Energy (keV) || Position || Expected Rate (Hz) ||ROOT Window || HpGe Rate (Hz) || Detector B Efficiency (%) | ||
|- | |- | ||
− | ||DetB_Eff_Ba133_14in.mpa || Ba-133 || 80.9979 || 14 in from DetB || 107840.607 ||[79:86] || | + | ||DetB_Eff_Ba133_14in.mpa || Ba-133 || 80.9979 || 14 in from DetB || 107840.607 ||[79:86] || 236.103+\-1.068 ||0.22 |
− | |- | + | |- |
|} | |} |
Latest revision as of 18:08, 26 April 2017
The source information can be found on the page below.
Theoretical Activities
Ba-133, 9.821 uCi on April 7, 2015, half life 10.51 years, 32.9% for 80.9979 keV line,activity in April 18, 2017 =8.589 uCi
- = for the 80.9979 line
Actual Activity
Run | Source | Energy (keV) | Position | Expected Rate (Hz) | ROOT Window | HpGe Rate (Hz) | Detector B Efficiency (%) |
DetB_Eff_Ba133_14in.mpa | Ba-133 | 80.9979 | 14 in from DetB | 107840.607 | [79:86] | 236.103+\-1.068 | 0.22 |