Difference between revisions of "12-23-2016"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
|- | |- | ||
|5602 || PAA configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 10 minute run, 450 Hz | |5602 || PAA configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 10 minute run, 450 Hz | ||
+ | |- | ||
+ | |5603 || PAA configuration Cf source on paperclip, '''Poly is out''', HpGe face is 50 cm from Cf source, 10 minute run, 450 Hz | ||
|- | |- | ||
|} | |} | ||
[[2nCor_44#Run_Plan]] | [[2nCor_44#Run_Plan]] |
Revision as of 00:52, 24 December 2016
Determine impact of Cf source on HpGe detector. A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.
Run # | Configuration |
---|---|
5598 | PAA configuration 10 uCi Na-22 and Co-60 source 32 cm from HpGe face |
5599 | PAA configuration Thorium welding rods on HpGe Face |
5600 | PAA configuration Thorium welding rods on HpGe Face changed threshold from 48 to 57 mV on HpGe trigger |
5602 | PAA configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 10 minute run, 450 Hz |
5603 | PAA configuration Cf source on paperclip, Poly is out, HpGe face is 50 cm from Cf source, 10 minute run, 450 Hz |