Difference between revisions of "12-23-2016"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
 
Determine impact of Cf source on HpGe detector.  A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.   
 
Determine impact of Cf source on HpGe detector.  A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.   
  
Line 8: Line 7:
 
|-
 
|-
 
|5599 || PAA configuration  Thorium welding rods on HpGe Face
 
|5599 || PAA configuration  Thorium welding rods on HpGe Face
 +
|-
 +
|5600 || PAA configuration  Thorium welding rods on HpGe Face
 
|-
 
|-
 
|}
 
|}
  
 
[[2nCor_44#Run_Plan]]
 
[[2nCor_44#Run_Plan]]

Revision as of 00:38, 24 December 2016

Determine impact of Cf source on HpGe detector. A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.

Run # Configuration
5598 PAA configuration 10 uCi Na-22 and Co-60 source 32 cm from HpGe face
5599 PAA configuration Thorium welding rods on HpGe Face
5600 PAA configuration Thorium welding rods on HpGe Face

2nCor_44#Run_Plan