Difference between revisions of "09-07-2016"
Jump to navigation
Jump to search
(Replaced content with "=Background= 11.1 MeV 2nCor_44#Run_Plan") |
|||
Line 1: | Line 1: | ||
− | + | Draft run plan | |
− | + | No target collimator open | |
− | + | DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V, | |
− | + | *Find lowest thresholds to run. | |
− | + | (3)Study forward detector gamma flas with Pb curtains | |
+ | (4)Thorium strip, collimator squeeze down. | ||
+ | (5)No target run | ||
+ | (6)Determine how many fissions per pulse. | ||
+ | (7)run 1 mg HEU to see (probably miserable) rates | ||
+ | (8)Exploratory measurements with 47% HEU. | ||
+ | (9) CFD studies | ||
+ | (10)P.S. sweep magnet in/out | ||
+ | (11) Long run on Thorium | ||
+ | (12) Long run on 1 mg HEU |
Revision as of 13:11, 7 September 2016
Draft run plan
No target collimator open DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V,
- Find lowest thresholds to run.
(3)Study forward detector gamma flas with Pb curtains (4)Thorium strip, collimator squeeze down. (5)No target run (6)Determine how many fissions per pulse. (7)run 1 mg HEU to see (probably miserable) rates (8)Exploratory measurements with 47% HEU. (9) CFD studies (10)P.S. sweep magnet in/out (11) Long run on Thorium (12) Long run on 1 mg HEU