Difference between revisions of "First Board for Beam Profile"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
[[File:Board_1.JPG|400px|thumb|left|Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run]][[File:Board_1_close_up.jpg|400px|thumb|center|Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry]] | [[File:Board_1.JPG|400px|thumb|left|Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run]][[File:Board_1_close_up.jpg|400px|thumb|center|Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry]] | ||
− | [[File:Holes_drilled.JPG|400px|thumb| | + | [[File:Holes_drilled.JPG|400px|thumb|left|Holes are drilled into the board to allow dose sticks to be attached to the back of the board]] |
</center> | </center> | ||
[[HC_TriMeV]] | [[HC_TriMeV]] |