Difference between revisions of "Long run peak sensing histograms"

From New IAC Wiki
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
=GEM-2.87 kV CATH-3.475 kV=
 +
 +
The run started as soon as the gas started following in the detector, the voltage for GEM and cathode as indicated in the title.
 +
 +
{| border="1" cellpadding="4"
 +
|-
 +
| Date ||Shutter || source || run number || Start || End || rate
 +
|-
 +
|11/19-20|| Open ||off || 7975 || 16:57:03 ||  09:27:23 || 117
 +
 +
|}
 +
 
=GEM-2.87 kV CATH-3.435 kV=
 
=GEM-2.87 kV CATH-3.435 kV=
  
Line 9: Line 21:
  
 
|}
 
|}
 
  
 
=GEM-2.87 kV CATH-2.93 kV=
 
=GEM-2.87 kV CATH-2.93 kV=
Line 20: Line 31:
  
 
|-
 
|-
|10/21|| || || 78 ||  ||  ||  
+
|10/22|| open || off || 7895 || 12:15:53 ||  16:25:54 || 33   || [[File:2runs_7895_96.png |100px]]
 +
|-
 +
|10/22-23|| closed || off || 7896 || 16:27:31 ||  08:32:32 || 36
  
 
|}
 
|}

Latest revision as of 16:24, 20 November 2014

GEM-2.87 kV CATH-3.475 kV

The run started as soon as the gas started following in the detector, the voltage for GEM and cathode as indicated in the title.

Date Shutter source run number Start End rate
11/19-20 Open off 7975 16:57:03 09:27:23 117

GEM-2.87 kV CATH-3.435 kV

Date Shutter source run number Start End rate
10/20-21 Open off 7883 06:19:01 08:43:46 107


GEM-2.87 kV CATH-2.93 kV

Date Shutter source run number Start End rate Notes
10/21-22 Open off 7886 10:57:39 10:44:21 44 Peak sensing has not have GEM input
10/22 open off 7895 12:15:53 16:25:54 33 2runs 7895 96.png
10/22-23 closed off 7896 16:27:31 08:32:32 36









GO BACK [1]