GEM Fission IAC 11082013: Difference between revisions
Jump to navigation
Jump to search
| (6 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
=Runlist= | =Runlist= | ||
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
| Line 33: | Line 32: | ||
| 6606|| added attenuator of 5 dB, switch the CFD to LED with a threshold of 150 mV,post amp no longer differentiating signal, Shutter '''Open''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 26 Hz, | | 6606|| added attenuator of 5 dB, switch the CFD to LED with a threshold of 150 mV,post amp no longer differentiating signal, Shutter '''Open''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 26 Hz, | ||
|- | |- | ||
| 6608|| added attenuator of 5 dB, LED with a threshold of 120 mV,post amp no longer differentiating signal, Shutter '''Open''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 55 Hz, | |||
|- | |||
| 6609|| added attenuator of 5 dB, LED with a threshold of 120 mV,post amp no longer differentiating signal, Shutter '''Closed''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 38 Hz, | |||
|- | |||
| 6663|| attenuator of 3 dB, LED with a threshold of 217 mV,post amp integrating 500, Shutter '''Open''' V_gem= 2820 V_cath=3225, 10 Hz clock in scaler channel 5, rate was 27 Hz, | |||
|- | |||
| 6664|| attenuator of 3 dB, LED with a threshold of 217 mV,post amp x1 integrating 500, Shutter '''Closed''' V_gem= 2820 V_cath=3225, 10 Hz clock in scaler channel 5, rate was 26 Hz, GFC for closed is 1219+_ 3, and for open 1820 +_2 [[File:r6664_scopepic.png| 200 px]] [[File:r6664-6663_cmpare.png| 200 px]] | |||
|- | |||
|} | |} | ||