Difference between revisions of "September 19, 2011"
(One intermediate revision by the same user not shown) | |||
Line 146: | Line 146: | ||
− | [https://wiki.iac.isu.edu/index.php | + | [https://wiki.iac.isu.edu/index.php?title=September_19,_2011 Go up] |
Latest revision as of 14:10, 20 September 2011
Summary of the day
- current 120 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Run # | Beam | Dump magnet | Collimator | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2479 | Up 90A |
In | Open | Yes | In | DU cylinder | Beam check-in run. Additional collimator in
R(beam down) = 0.000689 n/pulse |
2480 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0.000018 n/pulse |
2482 | Down 86A |
In | Open | Yes | In | DU cylinder | Beam check-in run.
R(beam down) = 0.000717 n/pulse |
2483 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam check-in run. Beam lost.
R(beam down) n/pulse |
- current 160 mA
- rep rate 180 Hz
Run # | Beam | Dump magnet | Collimator | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2488 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam returned without VS. Beam check-in run. Additional collimator in
R(beam down) = 0 n/pulse |
2489 | Down 86A |
In | Open | Yes | In | DU cylinder | Beam check-in run.
R(beam down) = 0.00057 n/pulse |
2490 | Up 90A |
In | Open | Yes | In | DU cylinder | Beam off. |
2491 | Up 90A |
In | Open | Yes | In | DU cylinder | Beam check-in run.
R(beam down) = 0.000569 n/pulse |
2492 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0 n/pulse |
Good beam, good turning. So there are production runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2494 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run
190006 pulses |
2495 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run
138898 pulses |
2496 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run
400347 pulses |
2497 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Long production run
visitors come in |
2498 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run
980887 pulses |
2499 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run
R(beam down) = 0 n/pulse -> ×180×60 = 0 n/min |
2500 | Down 86A |
In | Open | In | Yes | In | Out | Long production run. Beam off |
2501 | Down 86A |
In | Open | In | Yes | In | Out | Long production run.
R(beam down) = 0.000026 n/pulse -> ×180×60 = 0.28 n/min |