Difference between revisions of "September 16, 2011"
(10 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[https://wiki.iac.isu.edu/index.php/Sept_PhotFisRun_44MeV_2011#Log_eBook go back] | [https://wiki.iac.isu.edu/index.php/Sept_PhotFisRun_44MeV_2011#Log_eBook go back] | ||
− | == | + | ==Summary of the day== |
{| border="1" cellspacing="0" style="text-align: center; width: 1000px " | {| border="1" cellspacing="0" style="text-align: center; width: 1000px " | ||
Line 7: | Line 7: | ||
! scope="col" width="7.2%" | Dump magnet | ! scope="col" width="7.2%" | Dump magnet | ||
! scope="col" width="7.2%" | Collimator | ! scope="col" width="7.2%" | Collimator | ||
− | ! scope="col" width="7.2%" | Hardener | + | ! scope="col" width="7.2%" | Hardener 1" Al |
! scope="col" width="7.2%" | Radiator 10 um Al | ! scope="col" width="7.2%" | Radiator 10 um Al | ||
! scope="col" width="7.2%" | Target | ! scope="col" width="7.2%" | Target | ||
Line 72: | Line 72: | ||
<span style="color:red">Still bad</span><br> | <span style="color:red">Still bad</span><br> | ||
|- | |- | ||
− | |colspan="8"|<span style="color:red">'''Removed dump magnet | + | |colspan="8"|<span style="color:red">'''Removed dump magnet to retune beam'''</span> |
|- | |- | ||
Line 83: | Line 83: | ||
! scope="col" width="7.2%" | Dump magnet | ! scope="col" width="7.2%" | Dump magnet | ||
! scope="col" width="7.2%" | Collimator | ! scope="col" width="7.2%" | Collimator | ||
− | ! scope="col" width="7.2%" | Hardener | + | ! scope="col" width="7.2%" | Hardener 1" Al |
! scope="col" width="7.2%" | Radiator 25 um Al | ! scope="col" width="7.2%" | Radiator 25 um Al | ||
! scope="col" width="7.2%" | Target | ! scope="col" width="7.2%" | Target | ||
Line 98: | Line 98: | ||
R(beam down) = 49/108579 = 0.000451 n/pulse <span style="color:blue"> -> ×180×60 = ''' 4.9 n/min'''</span><br> | R(beam down) = 49/108579 = 0.000451 n/pulse <span style="color:blue"> -> ×180×60 = ''' 4.9 n/min'''</span><br> | ||
R(upstream) = 743/108579 = 0.00685 e+/pulse<br> | R(upstream) = 743/108579 = 0.00685 e+/pulse<br> | ||
− | <span style="color:red"> </span> | + | |- |
+ | |<span style="color:blue">'''2476'''</span>||Down<br> 86A||In ||Open ||Yes ||Out||DU cylinder | ||
+ | |align="left"|<span style="color:blue">'''Short production run ~10 min'''</span>. | ||
+ | R(beam down) = 1/108382 = 0.0000092 n/pulse<br> | ||
+ | R(upstream) = 161/108382 = 0.00148 e+/pulse<br> | ||
+ | <span style="color:red">About '''78%''' of photons are coming from the radiator according to PS. So-so</span><br> | ||
+ | Sweep and pair-spectrometer magnets were not in position as before, so it could affect the cnt rate of PS detectors for the last 3 runs. | ||
|- | |- | ||
Latest revision as of 23:33, 19 September 2011
Summary of the day
Run # | Beam | Dump magnet | Collimator | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2459 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 1/160279 = 0.0000062 n/pulse |
2460 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0/160873 = 0 n/pulse |
2461 | Down 86A |
In | Open | Yes | Down | DU cylinder | Beam check-in run.
R(beam down) = 33/160084 = 0.0002061 n/pulse -> ×180×60 = 2.2 n/min |
2462 | Up 90A |
In | Open | Yes | Up | DU cylinder | Beam check-in run.
R(beam down) = 0.000362 n/pulse -> ×180×60 = 3.9 n/min |
2463 | Up 90A |
In | Open | Yes | Up | Out | Beam check-in run.
R(beam down) = 0 n/pulse |
2464 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Short beam off
R(beam down) = 0.000029 n/pulse |
2465 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Redoing 2464
R(beam down) = 3/160876 = 0.000019 n/pulse |
2466 | Down 86A |
In | Open | Yes | Down | DU cylinder | Long production run
R(beam down) = 243/972019 = 0.00025 n/pulse -> ×180×60 = 2.7 n/min |
2467 | Up 90A |
In | Open | Yes | Up | DU cylinder | Long production run
R(beam down) = 292/972017 = 0.00030 n/pulse -> ×180×60 = 3.2 n/min |
2468 | Up 90A |
In | Open | Yes | Out | DU cylinder | Long production run
R(beam down) = 0/162265 = 0 n/pulse |
2469 | Up 90A |
In | Open | Yes | Out | DU cylinder | Long production run. Bean was turned up a little by operator's view screen.
R(beam down) = n/pulse |
Removed dump magnet to retune beam |
Run # | Beam | Dump magnet | Collimator | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2474 | Up 90A |
In | Open | Yes | Up | DU cylinder | Short production run ~10 min.
R(beam down) = 76/108383 = 0.000701 n/pulse -> ×180×60 = 7.6 n/min |
2475 | Down 86A |
In | Open | Yes | Down | DU cylinder | Short production run ~10 min.
R(beam down) = 49/108579 = 0.000451 n/pulse -> ×180×60 = 4.9 n/min |
2476 | Down 86A |
In | Open | Yes | Out | DU cylinder | Short production run ~10 min.
R(beam down) = 1/108382 = 0.0000092 n/pulse |