Difference between revisions of "September 13, 2011"
(12 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
! scope="col" width="8%" | Dump magnet | ! scope="col" width="8%" | Dump magnet | ||
! scope="col" width="8%" | Collimator | ! scope="col" width="8%" | Collimator | ||
+ | ! scope="col" width="8%" | Hardener | ||
! scope="col" width="8%" | Radiator 10 um Al | ! scope="col" width="8%" | Radiator 10 um Al | ||
! scope="col" width="8%" | Target | ! scope="col" width="8%" | Target | ||
− | ! scope="col" width=" | + | ! scope="col" width="100%" | Comments |
|- | |- | ||
− | |2385||Up 2 mm||In ||Open ||Out||DU plate | + | |2385||Up 2 mm||In ||Open ||No ||Out||DU plate |
|align="left"|Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view. | |align="left"|Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view. | ||
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br> | R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br> | ||
Line 20: | Line 21: | ||
<span style="color:red">Lost beam</span> | <span style="color:red">Lost beam</span> | ||
|- | |- | ||
− | |2386||Up 2 mm||In ||Open ||Up 2 mm||DU plate | + | |2386||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate |
− | |align="left"|Beam check-in run. 1" of Al hardener in front of upstream radiator. | + | |align="left"|Beam check-in run. '''1" of Al hardener in front of upstream radiator.''' |
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
R(beam 45 right) = n/pulse<br> | R(beam 45 right) = n/pulse<br> | ||
Line 29: | Line 30: | ||
<span style="color:red">About 92% of neutrons are coming from the radiator according to n detector down. Good</span> | <span style="color:red">About 92% of neutrons are coming from the radiator according to n detector down. Good</span> | ||
|- | |- | ||
− | |2387||Up 2 mm||In ||Open ||Up 2 mm||DU plate | + | |2387||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate |
|align="left"|<span style="color:red">Lost beam</span> | |align="left"|<span style="color:red">Lost beam</span> | ||
|- | |- | ||
− | |2388||Up 2 mm||In ||Open ||Up 2 mm||DU plate | + | |2388||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate |
− | |align="left"|Beam check-in run | + | |align="left"|Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation |
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
R(beam 45 right) = n/pulse<br> | R(beam 45 right) = n/pulse<br> | ||
Line 40: | Line 41: | ||
<span style="color:red">About % of photons are coming from the radiator according to PS. Bad</span><br> | <span style="color:red">About % of photons are coming from the radiator according to PS. Bad</span><br> | ||
|- | |- | ||
− | |2389-2395||Up 2 mm||In ||Open ||Up 2 mm||DU plate | + | |2389-2395||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate |
|align="left"|Detectors set-up. Two of them are non-working. | |align="left"|Detectors set-up. Two of them are non-working. | ||
|- | |- | ||
− | |2396||Up 2 mm||In ||Open ||Up 2 mm||DU plate | + | |2396||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate |
|align="left"|HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test | |align="left"|HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test | ||
R(beam 45 left) = 104/216929 = 0.000479 n/pulse <br> | R(beam 45 left) = 104/216929 = 0.000479 n/pulse <br> | ||
Line 50: | Line 51: | ||
R(upstream) = 4787/216929 = 0.02207 e+/pulse<br> | R(upstream) = 4787/216929 = 0.02207 e+/pulse<br> | ||
|- | |- | ||
− | |2397||Up 2 mm||In ||Open ||Out||DU plate | + | |2397||Up 2 mm||In ||Open ||1" Al ||Out||DU plate |
|align="left"|Radiator in/out test | |align="left"|Radiator in/out test | ||
R(beam 45 left) = 9/200289 = 0.0000449 n/pulse <br> | R(beam 45 left) = 9/200289 = 0.0000449 n/pulse <br> | ||
Line 56: | Line 57: | ||
R(beam down) = 19/200289 = 0.0000949 n/pulse<br> | R(beam down) = 19/200289 = 0.0000949 n/pulse<br> | ||
R(upstream) = 1113/200289 = 0.00556 e+/pulse<br> | R(upstream) = 1113/200289 = 0.00556 e+/pulse<br> | ||
− | <span style="color:red">About | + | <span style="color:red">About 75% of photons are coming from the radiator according to PS</span><br> |
|- | |- | ||
− | |2398||Down 2 mm||In ||Open ||Down 2 mm||DU plate | + | |2398||Down 2 mm||In ||Open ||1" Al ||Down 2 mm||DU plate |
|align="left"|Radiator in/out test | |align="left"|Radiator in/out test | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
Line 65: | Line 66: | ||
R(upstream) = e+/pulse<br> | R(upstream) = e+/pulse<br> | ||
|- | |- | ||
− | |2399||Down 2 mm||In ||Open ||Out||DU plate | + | |2399||Down 2 mm||In ||Open ||1" Al ||Out||DU plate |
|align="left"|Radiator in/out test | |align="left"|Radiator in/out test | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
Line 72: | Line 73: | ||
R(upstream) = e+/pulse<br> | R(upstream) = e+/pulse<br> | ||
<span style="color:red">About % of photons are coming from the radiator according to PS.</span><br> | <span style="color:red">About % of photons are coming from the radiator according to PS.</span><br> | ||
+ | |- | ||
+ | |2400||Up 2 mm||In ||Open ||1" Al ||Out||No | ||
+ | |align="left"| | ||
+ | |- | ||
+ | |2401||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| | ||
+ | |- | ||
+ | |2402||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
+ | |align="left"|Oleksiy moved radiator in | ||
+ | |- | ||
+ | |2403||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
+ | |align="left"|Jason moved radiator in. Same results. | ||
+ | |- | ||
+ | |2404||Center||In ||Open ||1" Al ||In||DU plate | ||
+ | |align="left"| | ||
+ | |- | ||
+ | |2405||Center||In ||Open ||1" Al ||In||DU plate | ||
+ | |align="left"|DU plate was repositioned. Now beam should hit small part of the target corner. | ||
+ | |- | ||
+ | |2406||Center||In ||Open ||1" Al ||In||DU plate | ||
+ | |align="left"|Same as 2405 | ||
+ | |- | ||
+ | |2407||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"|Additional shielding added around the core part of the beam pipe (downstream the radiator) | ||
+ | |- | ||
+ | |2408||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"|Same as 2407 but additional shielding removed to improve background countime rate | ||
+ | |- | ||
+ | |2409||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate | ||
+ | |align="left"| | ||
+ | |- | ||
+ | |2410||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate | ||
+ | |align="left"|Beam tuned up a bit, new camera was installed | ||
+ | |- | ||
+ | |2411||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| | ||
+ | |- | ||
+ | |2412||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| Put additional shielding around conical part of the beam pipe. | ||
+ | |- | ||
+ | |2413||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| same as 2412. slits @ 300 | ||
+ | |- | ||
+ | |2414||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| same as 2412. slits @ 200 | ||
+ | |- | ||
+ | |2415||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| same as 2412. slits @ 100 | ||
+ | |- | ||
+ | |2416||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| same as 2412. slits @ 60 | ||
+ | |- | ||
+ | |2417||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
+ | |align="left"| same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units | ||
|- | |- | ||
|} | |} | ||
+ | |||
+ | |||
+ | |||
+ | [https://wiki.iac.isu.edu/index.php/September_13,_2011 go up] |
Latest revision as of 16:57, 16 September 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | No | Out | DU plate | Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |
2387 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Lost beam |
2388 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
R(beam 45 left) = n/pulse |
2389-2395 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Detectors set-up. Two of them are non-working. |
2396 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test
R(beam 45 left) = 104/216929 = 0.000479 n/pulse |
2397 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Radiator in/out test
R(beam 45 left) = 9/200289 = 0.0000449 n/pulse |
2398 | Down 2 mm | In | Open | 1" Al | Down 2 mm | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |
2399 | Down 2 mm | In | Open | 1" Al | Out | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |
2400 | Up 2 mm | In | Open | 1" Al | Out | No | |
2401 | Up 2 mm | In | Open | 1" Al | Out | DU plate | |
2402 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Oleksiy moved radiator in |
2403 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Jason moved radiator in. Same results. |
2404 | Center | In | Open | 1" Al | In | DU plate | |
2405 | Center | In | Open | 1" Al | In | DU plate | DU plate was repositioned. Now beam should hit small part of the target corner. |
2406 | Center | In | Open | 1" Al | In | DU plate | Same as 2405 |
2407 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Additional shielding added around the core part of the beam pipe (downstream the radiator) |
2408 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Same as 2407 but additional shielding removed to improve background countime rate |
2409 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | |
2410 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam tuned up a bit, new camera was installed |
2411 | Up 2 mm | In | Open | 1" Al | Out | DU plate | |
2412 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Put additional shielding around conical part of the beam pipe. |
2413 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 300 |
2414 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 200 |
2415 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 100 |
2416 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 60 |
2417 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units |