Difference between revisions of "FC calibration (by view screen monitoring) 3/1/11"

From New IAC Wiki
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
  
[[File:FC Calibration 3.1.11.png | 1300 px]]
+
Below is the FC calibration by using view screen observation for 44 MeV seup
 +
 
 +
[[File:FC Calibration 3.1.11.png | 1200 px]]
  
  
Line 9: Line 11:
 
#red line is the fitting line for beam up
 
#red line is the fitting line for beam up
 
#green line is the fitting line for beam down
 
#green line is the fitting line for beam down
#green line is the fitting line for beam up and down
+
#black line is the fitting line for beam up and down
  
 
We can see that all three line is almost the same so we can use the fitting line for whole range of kicker magnet which is
 
We can see that all three line is almost the same so we can use the fitting line for whole range of kicker magnet which is

Latest revision as of 04:49, 4 March 2011

Go Back


Below is the FC calibration by using view screen observation for 44 MeV seup

FC Calibration 3.1.11.png


Here are:

  1. red line is the fitting line for beam up
  2. green line is the fitting line for beam down
  3. black line is the fitting line for beam up and down

We can see that all three line is almost the same so we can use the fitting line for whole range of kicker magnet which is

[math]x(cm)= 0.059 + 0.028\cdot I(Ampers)[/math]


Go Back