Difference between revisions of "Qweak TaskList"
Jump to navigation
Jump to search
(New page: Remaining tasks for installing R1. {| border="1" |cellpadding="20" cellspacing="0 |Start Date |Status | Task |- |}) |
|||
| (10 intermediate revisions by the same user not shown) | |||
| Line 6: | Line 6: | ||
| Task | | Task | ||
|- | |- | ||
| + | | 11/14/09 | ||
| + | | done | ||
| + | | HV test Qweak detector | ||
| + | |- | ||
| + | | | ||
| + | | | ||
| + | |Measure GEM trigout rates -vs- HV | ||
| + | |- | ||
| + | | | ||
| + | | | ||
| + | | Measure GEM tracking resolution | ||
| + | |- | ||
| + | | | ||
| + | | | ||
| + | | Measure GEM QE and uniformity | ||
| + | |- | ||
| + | | | ||
| + | | | ||
| + | | Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA) | ||
| + | |- | ||
| + | | 1/20/10 | ||
| + | | | ||
| + | | Hit Pattern GUI from V1495 output | ||
| + | |- | ||
| + | | | ||
| + | | | ||
| + | | HV remote control software (steve wood has solution we need to copy) | ||
| + | |- | ||
| + | | | ||
| + | | | ||
| + | | Quick Release GEM detector to rotator attachment system | ||
| + | |- | ||
| + | | 8/27/07 | ||
| + | | | ||
| + | | VFAT control and Monitoring Web interface | ||
|} | |} | ||
| + | |||
| + | |||
| + | [http://wiki.iac.isu.edu/index.php/Qweak Go Back] [[Qweak]] | ||
Latest revision as of 13:44, 18 May 2009
Remaining tasks for installing R1.
| Start Date | Status | Task |
| 11/14/09 | done | HV test Qweak detector |
| Measure GEM trigout rates -vs- HV | ||
| Measure GEM tracking resolution | ||
| Measure GEM QE and uniformity | ||
| Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA) | ||
| 1/20/10 | Hit Pattern GUI from V1495 output | |
| HV remote control software (steve wood has solution we need to copy) | ||
| Quick Release GEM detector to rotator attachment system | ||
| 8/27/07 | VFAT control and Monitoring Web interface |