Difference between revisions of "Group Meetings"
Jump to navigation
Jump to search
| (11 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | = Friday July 13th 2007 = | + | ==Friday April 18th 2008== |
| + | *Well's computers are up and running. Problems with USB and Vista or motherboard. | ||
| + | *Shad will get new backup server working with Windows machines. | ||
| + | *Airconditioning fixed in cluster room. | ||
| + | ==Friday March 7th 2008== | ||
| + | *We have had meetings since October 2007 (just not recorded on Wiki) | ||
| + | *Items discussed | ||
| + | **Broken backup server drives | ||
| + | **Broken air conditioning | ||
| + | **E-mail server | ||
| + | **Shad's power outage | ||
| + | **Origin license | ||
| + | **Do a beter job updating the Wiki | ||
| + | **Ignacio's programming | ||
| + | ==Friday October 5th 2007== | ||
| + | *Items to be discussed: | ||
| + | **E-Mail Server Options | ||
| + | ***Contract Out $50/yr/user | ||
| + | ***Set up server equipment in physics | ||
| + | ***Live with G-Mail | ||
| + | ***IAC Only Mail Server | ||
| + | **Licenses | ||
| + | ==Friday August 10th 2007== | ||
| + | *Items to discuss: | ||
| + | **New network ports | ||
| + | **Origin licensing | ||
| + | **Replacing MPA machines (Currently 1.3GHz Celerons with 384MB RAM) | ||
| + | ==Friday July 27th 2007== | ||
| + | *Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it. | ||
| + | *Password change has started | ||
| + | *Optical link to control rack will occur during september upgrades | ||
| + | |||
| + | ==Friday July 13th 2007== | ||
*First meeting. | *First meeting. | ||
*Made a list of current issues that can be found here [[List of Current Issue]]. | *Made a list of current issues that can be found here [[List of Current Issue]]. | ||
*Decided to meet every other week after the IAC staff meeting. | *Decided to meet every other week after the IAC staff meeting. | ||
| − | |||
| − | |||
| − | |||
Latest revision as of 16:48, 18 April 2008
Friday April 18th 2008
- Well's computers are up and running. Problems with USB and Vista or motherboard.
- Shad will get new backup server working with Windows machines.
- Airconditioning fixed in cluster room.
Friday March 7th 2008
- We have had meetings since October 2007 (just not recorded on Wiki)
- Items discussed
- Broken backup server drives
- Broken air conditioning
- E-mail server
- Shad's power outage
- Origin license
- Do a beter job updating the Wiki
- Ignacio's programming
Friday October 5th 2007
- Items to be discussed:
- E-Mail Server Options
- Contract Out $50/yr/user
- Set up server equipment in physics
- Live with G-Mail
- IAC Only Mail Server
- Licenses
- E-Mail Server Options
Friday August 10th 2007
- Items to discuss:
- New network ports
- Origin licensing
- Replacing MPA machines (Currently 1.3GHz Celerons with 384MB RAM)
Friday July 27th 2007
- Nitrogen Filling Issue Discussed. Alan and Brian will keep an eye on it.
- Password change has started
- Optical link to control rack will occur during september upgrades
Friday July 13th 2007
- First meeting.
- Made a list of current issues that can be found here List of Current Issue.
- Decided to meet every other week after the IAC staff meeting.