Difference between revisions of "CH Task List"
Jump to navigation
Jump to search
(→9/7/21) |
|||
(One intermediate revision by the same user not shown) | |||
Line 92: | Line 92: | ||
* Solved binning issues regarding calibrated spectrum (X) | * Solved binning issues regarding calibrated spectrum (X) | ||
− | |||
==9/23/21== | ==9/23/21== | ||
Line 103: | Line 102: | ||
* Find dead time using upper and lower part of dual timer (Live time) | * Find dead time using upper and lower part of dual timer (Live time) | ||
+ | |||
+ | ==11/16/21== | ||
+ | |||
+ | * Check attenuation measurements for Cf252 through poly to look for double counting | ||
='''Go Back'''= | ='''Go Back'''= |
Latest revision as of 00:27, 17 November 2021
Notes from biweekly meetings
5/27/21
To Do List
- Add dual timer configuration to plateau page (X)
- Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X)
- Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)
- NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
- Begin experimental setup in clean room (X)
- Test HPGe detector -> Work has begun on this by a colleague
- Complete latest assigned training module (X)
- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
- Move painted lead bricks to clean room (X)
- Linked manual for HPGe detector to wiki pages (X)
- Add files sent by collaborator on HPGe detector page
- Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
- Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
- Finish 1100V source out data collection (X)
- Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
- Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
- Create wiki page for DD generator page
- Include shielding papers and manuals -> will talk to Joe about this
- Paul got his tape measure unstuck from the clean room (X)
- We're all very proud of him
6/10/21
To Do List
- Finish attenuation measurements (X) and data analysis for He3 detector (X)
- Virgin poly (X)
- Continue experimental set up (X)
- Model cradle for NaI detector for lead tube (X)
- Talk to Roy Dunker about HPGe software (X)
- Have CDs for the software, colleague will attempt to get it working
6/24/21
To Do List
- Start mcnp simulations (X)
- Find level of boron doping in poly through simulations
- Print NaI cradle (X)
- Cradle is printed, need to pick up (X)
- Photon attenuation measurements for lead with NaI
- Start with sheets, then go to one or two bricks
- boral around all sides and make exit with lead bricks
- Start with sheets, then go to one or two bricks
- BorAl attenuation measurements for neutrons with He3 (X)
- Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary)
- Green borated poly and regular poly (X)
- Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary)
- Rebuild computer with updated operating system and rebuilt with newest version of root (X)
- Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector (not necessary)
- (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup
- Design the thermalizing box in some 3D modeling software to allow for easy manipulation without cutting extra poly (X)
- Wiki page has been created in regards to this (X)
9/7/21
- Longer Cf252 measurements (Gd in & out) (X)
- More lead in front of Cf252 (maybe in pig) (X)
- He3 tube measurements (maybe) (X)
- Finish isotope table (X)
- Solved binning issues regarding calibrated spectrum (X)
9/23/21
- HPGe Efficiency
- Print cradles for HPGe detector
- Draw electronics chain for HPGe detector with each value notated
- Find dead time using upper and lower part of dual timer (Live time)
11/16/21
- Check attenuation measurements for Cf252 through poly to look for double counting