==5/27/21== | ==5/27/21== | ||
− | + | '''To Do List''' | |
− | + | * Add dual timer configuration to plateau page (X) | |
− | + | * Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X) | |
+ | ** Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github) | ||
− | + | * NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead | |
− | + | * Begin experimental setup in clean room (X) | |
− | - | + | * Test HPGe detector -> Work has begun on this by a colleague |
− | + | * Complete latest assigned training module (X) | |
− | - | + | * Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X) |
− | - | + | * Move painted lead bricks to clean room (X) |
+ | |||
+ | * Linked manual for HPGe detector to wiki pages (X) | ||
+ | ** Add files sent by collaborator on HPGe detector page | ||
+ | |||
+ | * Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X) | ||
+ | ** Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X) | ||
+ | |||
+ | * Finish 1100V source out data collection (X) | ||
+ | |||
+ | * Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list | ||
+ | |||
+ | * Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X) | ||
+ | |||
+ | * Create wiki page for DD generator page | ||
+ | ** Include shielding papers and manuals -> will talk to Joe about this | ||
+ | |||
+ | * Paul got his tape measure unstuck from the clean room (X) | ||
+ | ** We're all very proud of him | ||
+ | |||
+ | ==6/10/21== | ||
+ | |||
+ | '''To Do List''' | ||
+ | |||
+ | * Finish attenuation measurements (X) and data analysis for He3 detector (X) | ||
+ | ** Virgin poly (X) | ||
+ | |||
+ | * Continue experimental set up (X) | ||
+ | |||
+ | * Model cradle for NaI detector for lead tube (X) | ||
+ | |||
+ | * Talk to Roy Dunker about HPGe software (X) | ||
+ | ** Have CDs for the software, colleague will attempt to get it working | ||
+ | |||
+ | ==6/24/21== | ||
+ | |||
+ | '''To Do List''' | ||
+ | |||
+ | * Start mcnp simulations (X) | ||
+ | ** Find level of boron doping in poly through simulations | ||
+ | |||
+ | * Print NaI cradle (X) | ||
+ | ** Cradle is printed, need to pick up (X) | ||
+ | |||
+ | * Photon attenuation measurements for lead with NaI | ||
+ | ** Start with sheets, then go to one or two bricks | ||
+ | *** boral around all sides and make exit with lead bricks | ||
+ | |||
+ | * BorAl attenuation measurements for neutrons with He3 (X) | ||
+ | ** Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary) | ||
+ | *** Green borated poly and regular poly (X) | ||
+ | |||
+ | * Rebuild computer with updated operating system and rebuilt with newest version of root (X) | ||
+ | |||
+ | * Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector (not necessary) | ||
+ | |||
+ | * (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup | ||
+ | |||
+ | * Design the thermalizing box in some 3D modeling software to allow for easy manipulation without cutting extra poly (X) | ||
+ | ** Wiki page has been created in regards to this (X) | ||
+ | |||
+ | ==9/7/21== | ||
+ | |||
+ | * Longer Cf252 measurements (Gd in & out) (X) | ||
+ | |||
+ | * More lead in front of Cf252 (maybe in pig) (X) | ||
+ | |||
+ | * He3 tube measurements (maybe) (X) | ||
+ | |||
+ | * Finish isotope table (X) | ||
+ | |||
+ | * Solved binning issues regarding calibrated spectrum (X) | ||
+ | |||
+ | ==9/23/21== | ||
+ | |||
+ | * HPGe Efficiency | ||
+ | |||
+ | * Print cradles for HPGe detector | ||
+ | |||
+ | * Draw electronics chain for HPGe detector with each value notated | ||
+ | |||
+ | * Find dead time using upper and lower part of dual timer (Live time) | ||
+ | |||
+ | ==11/16/21== | ||
+ | |||
+ | * Check attenuation measurements for Cf252 through poly to look for double counting | ||
+ | |||
+ | ='''Go Back'''= | ||
---- | ---- | ||
+ | [[CH_PAS_Master_Timeline]] | ||
+ | |||
[[PAS_Experiment]] | [[PAS_Experiment]] |
Latest revision as of 00:27, 17 November 2021
Notes from biweekly meetings
5/27/21
To Do List
- Add dual timer configuration to plateau page (X)
- Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X)
- Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)
- NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
- Begin experimental setup in clean room (X)
- Test HPGe detector -> Work has begun on this by a colleague
- Complete latest assigned training module (X)
- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
- Move painted lead bricks to clean room (X)
- Linked manual for HPGe detector to wiki pages (X)
- Add files sent by collaborator on HPGe detector page
- Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
- Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
- Finish 1100V source out data collection (X)
- Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
- Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
- Create wiki page for DD generator page
- Include shielding papers and manuals -> will talk to Joe about this
- Paul got his tape measure unstuck from the clean room (X)
- We're all very proud of him
6/10/21
To Do List
- Finish attenuation measurements (X) and data analysis for He3 detector (X)
- Virgin poly (X)
- Continue experimental set up (X)
- Model cradle for NaI detector for lead tube (X)
- Talk to Roy Dunker about HPGe software (X)
- Have CDs for the software, colleague will attempt to get it working
6/24/21
To Do List
- Start mcnp simulations (X)
- Find level of boron doping in poly through simulations
- Print NaI cradle (X)
- Cradle is printed, need to pick up (X)
- Photon attenuation measurements for lead with NaI
- Start with sheets, then go to one or two bricks
- boral around all sides and make exit with lead bricks
- Start with sheets, then go to one or two bricks
- BorAl attenuation measurements for neutrons with He3 (X)
- Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary)
- Green borated poly and regular poly (X)
- Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary)
- Rebuild computer with updated operating system and rebuilt with newest version of root (X)
- Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector (not necessary)
- (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup
- Design the thermalizing box in some 3D modeling software to allow for easy manipulation without cutting extra poly (X)
- Wiki page has been created in regards to this (X)
9/7/21
- Longer Cf252 measurements (Gd in & out) (X)
- More lead in front of Cf252 (maybe in pig) (X)
- He3 tube measurements (maybe) (X)
- Finish isotope table (X)
- Solved binning issues regarding calibrated spectrum (X)
9/23/21
- HPGe Efficiency
- Print cradles for HPGe detector
- Draw electronics chain for HPGe detector with each value notated
- Find dead time using upper and lower part of dual timer (Live time)
11/16/21