Difference between revisions of "2NCorr SP DP analysis"

From New IAC Wiki
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
[[Production_Analysis|go_back]]
 
[[Production_Analysis|go_back]]
  
Simply dividing SP distribution by DP distribution from DU produces the following plot:  
+
==DU==
 +
Accidental subtraction is done as follows: (SP-0.5*DP)/DP
 +
[[File:2NCorr th nn DU0 5.png|750px]]
 +
----
  
[[File:2NCorrSP Over DP DU.png|750px]]
+
[[File:2NCorr th nn DU1 5.png| 750px]]
 +
----
  
Acceptance plot
+
[[File:2NCorr th nn DU2 5.png| 750px]]
  
[[File:2Ncorr Acceptance.png|750px]]
+
==Th==
 +
[[File:2NCorr th nn Th0 5.png|750px]]

Latest revision as of 17:59, 14 December 2017

go_back

DU

Accidental subtraction is done as follows: (SP-0.5*DP)/DP 2NCorr th nn DU0 5.png


2NCorr th nn DU1 5.png


2NCorr th nn DU2 5.png

Th

2NCorr th nn Th0 5.png