Difference between revisions of "TF NeutronCorrelations"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
The wall between the 44 MeV machine and the experimental cell is 6 feet thick. The first 18 inches are concrete, followed by dirt until the last 18 inches where concrete resumes. | The wall between the 44 MeV machine and the experimental cell is 6 feet thick. The first 18 inches are concrete, followed by dirt until the last 18 inches where concrete resumes. | ||
+ | |||
+ | [[Simulation_TF_Ncor]] | ||
[[User_talk:Foretony#IAC]] | [[User_talk:Foretony#IAC]] |
Latest revision as of 23:20, 30 June 2014
Aluminum radiator of thickness t
cylindrical U-235 or P-239 target 1" diameter and 3" high
target to radiator distance = 6 m
collimator to radiator distance = 3 m
create tuple with all the photons that hit the target.
The wall between the 44 MeV machine and the experimental cell is 6 feet thick. The first 18 inches are concrete, followed by dirt until the last 18 inches where concrete resumes.