Difference between revisions of "GEM performance QDC data graphs"
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | =histogram analysis Shutter Open - Closed= | + | =electronics Setup= |
+ | |||
+ | [[File:LDS_VME_QDC.png |200px]] | ||
+ | [[File:LDS_electronics_modules_NIMbins.png |200px]] | ||
+ | [[File:IAC_electronics_flow_chart.png |200px]] | ||
+ | |||
+ | =histogram analysis Shutter Open - Closed in LDS Lab= | ||
GEM detector voltage settings: | GEM detector voltage settings: | ||
Line 35: | Line 41: | ||
| Shutter Open - Shutter Closed Difference | | Shutter Open - Shutter Closed Difference | ||
|} | |} | ||
− | |||
=Run List1 GEM, Cathode 2.6, 2.9kV= | =Run List1 GEM, Cathode 2.6, 2.9kV= | ||
Line 363: | Line 368: | ||
− | + | [[File:cal_2amps_6_6_17dB.png | 90px]] | |
=Run List 7 GEM,Cathode 2.8,3.2kV= | =Run List 7 GEM,Cathode 2.8,3.2kV= | ||
Line 387: | Line 392: | ||
|} | |} | ||
+ | |||
+ | [[File:cal_2amps_6_6_17dB.png | 90px]] | ||
=Run List 8 GEM,Cathode 2.8,3.3kV= | =Run List 8 GEM,Cathode 2.8,3.3kV= | ||
Line 404: | Line 411: | ||
|Run # || discrimination level || ortec 474 amplification || Attenuation (dB) || Start Date|| End Date ||Shutter Position || Source || pulse snapshot picture and Comparison notes|| Channel number || ADC charge (nC) || Detector charge (nC) | |Run # || discrimination level || ortec 474 amplification || Attenuation (dB) || Start Date|| End Date ||Shutter Position || Source || pulse snapshot picture and Comparison notes|| Channel number || ADC charge (nC) || Detector charge (nC) | ||
|- | |- | ||
− | |5327 || 1.63 || 6 level 6 || 17 || 10:43:33 06/11 || 13:35:20 06/11 || open || off || 10Hz [[File: r5327_17att_ortex6_6_shutteropen_sourceoff.png | 90px ]] || || || | + | |5327 || 1.63 || 6 level 6 || 17 || 10:43:33 06/11 || 13:35:20 06/11 || open || off || 10Hz [[File: r5327_17att_ortex6_6_shutteropen_sourceoff.png | 90px ]] N= 0.000096339|| || || |
|} | |} | ||
Latest revision as of 02:55, 23 April 2014
electronics Setup
histogram analysis Shutter Open - Closed in LDS Lab
GEM detector voltage settings:
Discriminator:
Amplification:
Shutter open run 4676 took data for 44480 seconds (12.4 hrs) and Shutter closed run 4675 took data for 28638 seconds (8 hrs)
Run 4676 :raw shutter Open ADC spectrum | Run 4675 raw shutter closed ADC spectrum |
Run 4676 :NORMALIZED shutter Open ADC spectrum | Run 4675 NORMALIZED shutter closed ADC spectrum |
Assume that the single peak for the Closed shutter spectrum is the result of less charge being liberated by the right most peak of the shutter open spectrum due to the energy lost by the ionizing particle as it travels through the 1mm thick FR4 shutter into the ionization chamber.
Run 4676 :raw shutter Open ADC spectrum | Run 4675 raw shutter closed ADC spectrum |
Shutter Open - Shutter Closed Difference |
Run List1 GEM, Cathode 2.6, 2.9kV
/home/daq/CODA/CODAreader/ROOT_V5.30/V775mV792/evio2nt -fr4685.dat > /dev/null
The voltage of the Cathode is 2.9 kV and of the GEMs is 2.6 kV.
The amplifier is on x6 level fine gain which will amplify the detector signal to 33.5 times (6.56+_ 0+_ V/196 +_ 0.6mV).
Data Analysis 1 Amp.set up 6_4.5
For Shutter open bin number 67
Run Number | Channel Number | Number of Counts | Error (bin width | STD | |
4676 | 2960 | 16960 | 45 | ||
4680 | 2961 | 11424 | 45 | ||
4682 | 2961 | 21595 | 45 |
For shutter close and bin number 57:
Run Number | Channel Number | Number of Counts | Error (bin width | STD | |
4683 | 2516 | 24070 | 45 | ||
4679 | 2516 | 15160 | 45 | ||
4675 | 2514 | 14200 | 45 |
Run List2 GEM,Cathode 2.65,2.95kV
The voltage of the Cathode is 2.95 kV and of the GEMs is 2.65 kV.
which peak is Beta?
Run 5200 has a shift more the other runs, the run represented the charge collected as the shutter is close. Averaging three runs as the shutter is open, then subtracting 5200 are represented by the following figures.
Run 4676 :Average of normalized shutter Open ADC spectrum | Run 5200 normalized, shutter closed ADC spectrum |
subtracting close from open |
Relative Gain increase
I increased the voltage 50 volts and I had to attenuate 8 db this means that a 50 volt increase in the GEM pre-amplifier resulted in a gain increase of ?.
Run List3 GEM,Cathode 2.7,3kV
- Calibration curve
,Measurements
The voltage of the Cathode is 3 kV and of the GEMs is 2.7 kV. Without any attenuation -85 mV was the initial voltage and its equivalent charge is 1.02 nC. According this value the charge below is calculated using
Run List 4 GEM,Cathode 2.75,3.05kV
Run List 5 GEM,Cathode 2.8,3.10kV
Run List 6 GEM,Cathode 2.8,3.00kV
Run List 7 GEM,Cathode 2.8,3.2kV
Run List 8 GEM,Cathode 2.8,3.3kV
Run List 8 GEM,Cathode 2.8,3.4kV
Run List 8 GEM,Cathode 2.8,3.5kV
Run # | discrimination level | ortec 474 amplification | Attenuation (dB) | Start Date | End Date | Shutter Position | Source | pulse snapshot picture and Comparison notes | Channel number | ADC charge (nC) | Detector charge (nC) |
5328 | 1.63 | 6 level 6 | 17 | 13:37:09 06/11 | 13:35:20 06/11 | open | off | 10Hz 90px |
Go back [1]