=Runlist= | =Runlist= | ||
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
Line 11: | Line 10: | ||
| 6593|| Run GEM detector in Hall at V_gem= 2700 V_cath=3150, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 27 Hz, [[File:r6588-6593_cmpare.png| 200 px]][[File:r6593_scopepic.png| 200 px]] | | 6593|| Run GEM detector in Hall at V_gem= 2700 V_cath=3150, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 27 Hz, [[File:r6588-6593_cmpare.png| 200 px]][[File:r6593_scopepic.png| 200 px]] | ||
|- | |- | ||
− | | | + | | 6594|| V_gem= 2750 V_cath=3150, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 27 Hz, |
|- | |- | ||
− | | 6595|| Shutter '''Closed''' now V_gem= 2750 V_cath=3150, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 27 Hz, | + | | 6595|| Shutter '''Closed''' now V_gem= 2750 V_cath=3150, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 27 Hz, 33 min 29 sec, |
|- | |- | ||
+ | | 6596|| Shutter '''Open''' now V_gem= 2800 V_cath=3100, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 31 Hz, | ||
+ | |- | ||
+ | | 6597|| Shutter '''Closed''' now V_gem= 2800 V_cath=3100, CFD threshold at 88 mV, 10 Hz clock in scaler channel 5, rate was 27 Hz, | ||
+ | |- | ||
+ | | 6598|| Decreased Post amp from x6 to x1 Shutter '''Closed''' V_gem= 2800 V_cath=3100, CFD threshold at 21 mV, 10 Hz clock in scaler channel 5, rate was 22 Hz, | ||
+ | |- | ||
+ | | 6599|| same as run 6598 V_gem= 2800 V_cath=2800, CFD threshold at 21 mV, rate was 79 Hz, | ||
+ | |- | ||
+ | | 6600|| Decreased Post amp from x6 to x1 Shutter '''Closed''' V_gem= 2800 V_cath=3100, CFD threshold at 15 mV, 10 Hz clock in scaler channel 5, rate was 79 Hz, | ||
+ | |- | ||
+ | | 6601|| Decreased Post amp from x6 to x1 Shutter '''Open''' V_gem= 2800 V_cath=3100, CFD threshold at 15 mV, 10 Hz clock in scaler channel 5, rate was 114 Hz, | ||
+ | |- | ||
+ | | 6603|| added attenuator, changed CFD post amp no longer differentiating signal, Shutter '''Closed''' V_gem= 2800 V_cath=3100, 10 Hz clock in scaler channel 5, rate was 114 Hz, | ||
+ | |- | ||
+ | | 6605|| added attenuator of 5 dB, switch the CFD to LED with a threshold of 150 mV,post amp no longer differentiating signal, Shutter '''Closed''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 26 Hz, | ||
+ | |- | ||
+ | | 6606|| added attenuator of 5 dB, switch the CFD to LED with a threshold of 150 mV,post amp no longer differentiating signal, Shutter '''Open''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 26 Hz, | ||
+ | |- | ||
+ | | 6608|| added attenuator of 5 dB, LED with a threshold of 120 mV,post amp no longer differentiating signal, Shutter '''Open''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 55 Hz, | ||
+ | |- | ||
+ | | 6609|| added attenuator of 5 dB, LED with a threshold of 120 mV,post amp no longer differentiating signal, Shutter '''Closed''' V_gem= 2850 V_cath=3200, 10 Hz clock in scaler channel 5, rate was 38 Hz, | ||
+ | |- | ||
+ | |||
+ | | 6663|| attenuator of 3 dB, LED with a threshold of 217 mV,post amp integrating 500, Shutter '''Open''' V_gem= 2820 V_cath=3225, 10 Hz clock in scaler channel 5, rate was 27 Hz, | ||
+ | |- | ||
+ | | 6664|| attenuator of 3 dB, LED with a threshold of 217 mV,post amp x1 integrating 500, Shutter '''Closed''' V_gem= 2820 V_cath=3225, 10 Hz clock in scaler channel 5, rate was 26 Hz, GFC for closed is 1219+_ 3, and for open 1820 +_2 [[File:r6664_scopepic.png| 200 px]] [[File:r6664-6663_cmpare.png| 200 px]] | ||
+ | |- | ||
+ | |||
+ | |||
|} | |} | ||