Difference between revisions of "PosRun 10 14 2013"
Jump to navigation
Jump to search
Line 39: | Line 39: | ||
===40 MeV on Tungsten=== | ===40 MeV on Tungsten=== | ||
+ | |||
+ | 40 MeV electrons are hitting the positron production Tungsten target | ||
+ | |||
+ | |||
+ | |||
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
Line 44: | Line 49: | ||
| Run # || Run Duration (s) || Configuration | | Run # || Run Duration (s) || Configuration | ||
|- | |- | ||
− | | 6503 || min s ( pulses) || same as | + | | 6503 || 3 min 46 s ( pulses) || Dipoles in positron mode. Al Brick in along 8 inch length |
+ | |- | ||
+ | | 6504 || min s ( pulses) || same as previou run, Al brick OUT | ||
|} | |} | ||
Revision as of 19:55, 14 October 2013
Run list
Scaler channel #2 counts the number of beam pulses
Detector 4 is Beam Left and in ADC channel 7, Ortec Dual Spec amp set to course=10, fine=39, Canberra CFD set to 85 mV lower threshold
Detector 1 is Beam Right and in ADC channel 3, Ortec Dual Spec amp set to course=20, fine=10, Canberra CFD set to 70 mV lower threshold
In-flight
40 MeV on Tungsten
40 MeV electrons are hitting the positron production Tungsten target
Run # | Run Duration (s) | Configuration |
6503 | 3 min 46 s ( pulses) | Dipoles in positron mode. Al Brick in along 8 inch length |
6504 | min s ( pulses) | same as previou run, Al brick OUT |
FC -vs- 90A beam stop correlation
FC = Aluminum brick 2" from exit window near NaI detectors
50 Ohm scope termination
90 A BS (nVs) | FC (nVs) |
47 | 25 |
24 | 11.9 |
13 | 6 |
6.1 | 2.3 |
4.8 | 1.8 |