Difference between revisions of "PosRun 10 14 2013"
Jump to navigation
Jump to search
Line 32: | Line 32: | ||
| 6500 || min s (54420 , 120 Hz pulses =453.5 sec)|| same as above except: removed Al brick beam stop, increased current from zero until signal was observed in experimental cell NaI (probably mostly dark current from RF cavity) | | 6500 || min s (54420 , 120 Hz pulses =453.5 sec)|| same as above except: removed Al brick beam stop, increased current from zero until signal was observed in experimental cell NaI (probably mostly dark current from RF cavity) | ||
|- | |- | ||
− | | 6501 || min s (54297 pulses) || same as above except: inserted Al brick beam stop | + | | 6501 || min s (54297 pulses) || same as above except: inserted Al brick beam stop, [[File:r6500-01.png | 200 px]] |
|- | |- | ||
| 6502 || min s (54297 pulses) || same as above except: REmoved Al brick beam stop | | 6502 || min s (54297 pulses) || same as above except: REmoved Al brick beam stop |
Revision as of 16:59, 14 October 2013
Run list
Scaler channel #2 counts the number of beam pulses
Detector 4 is Beam Left and in ADC channel 7, Ortec Dual Spec amp set to course=10, fine=39, Canberra CFD set to 85 mV lower threshold
Detector 1 is Beam Right and in ADC channel 3, Ortec Dual Spec amp set to course=20, fine=10, Canberra CFD set to 70 mV lower threshold
FC -vs- 90A beam stop correlation
FC = Aluminum brick 2" from exit window near NaI detectors
50 Ohm scope termination
90 A BS (nVs) | FC (nVs) |
47 | 25 |
24 | 11.9 |
13 | 6 |
6.1 | 2.3 |
4.8 | 1.8 |