Difference between revisions of "PosRun 10 14 2013"

From New IAC Wiki
Jump to navigation Jump to search
Line 28: Line 28:
 
|  6498  ||  min  s  || same as above except: -500 Volts, magnet out
 
|  6498  ||  min  s  || same as above except: -500 Volts, magnet out
 
|-
 
|-
|  6499  ||  min  s  || same as above except: -700 Volts
+
|  6499  ||  min  s  || same as above except: -700 Volts, very similar ADC spectrum for magnet in
 
|}
 
|}
  

Revision as of 16:21, 14 October 2013

Run list

Scaler channel #2 counts the number of beam pulses

Detector 4 is Beam Left and in ADC channel 7, Ortec Dual Spec amp set to course=10, fine=39, Canberra CFD set to 85 mV lower threshold

Detector 1 is Beam Right and in ADC channel 3, Ortec Dual Spec amp set to course=20, fine=10, Canberra CFD set to 70 mV lower threshold


Run # Run Duration (s) Configuration
6488 min s 2->60Hz rep rate, Looking at NaI in shielded cell at -600 Volts, Magnet on Accelerator side deflects electrons, Tungsten target is out, triggering only on the beam gate and looking at ADC channel 3
6489 min s same as above except: 120Hz rep rate, -500 Volts,
6490 min s same as above except: -550 Volts,
6491 min s same as above except: -575 Volts,
6492 min s same as above except: inserted Aluminum brick to be sure electrons are staying on accelerator side, drops NaI output by factor of 2
6493 min s same as above except: -600 Volts
6494 min s same as above except: -700 Volts
6498 min s same as above except: -500 Volts, magnet out
6499 min s same as above except: -700 Volts, very similar ADC spectrum for magnet in


FC -vs- 90A beam stop correlation

FC = Aluminum brick 2" from exit window near NaI detectors


50 Ohm scope termination

90 A BS (nVs) FC (nVs)
47 25
24 11.9
13 6
6.1 2.3
4.8 1.8


Positrons_Using_40Mev_Linac