Difference between revisions of "Qweak"
(33 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
[https://qweak.jlab.org/wiki/index.php/Main_Page Qweak wiki] | [https://qweak.jlab.org/wiki/index.php/Main_Page Qweak wiki] | ||
+ | |||
+ | [https://hallcweb.jlab.org/hclog/ hclog] | ||
[[Qweak_TaskList]] | [[Qweak_TaskList]] | ||
+ | |||
+ | <pre> | ||
+ | Complete work and be ready for beam before October 20, 2011. | ||
+ | |||
+ | Drop Dead date is November 1. | ||
+ | </pre> | ||
=Physics= | =Physics= | ||
+ | |||
+ | dDelta letter of intent PAC25 2003 | ||
+ | |||
+ | [[File:LOI-03-105.pdf ]] | ||
+ | |||
[[Qweak_Delta]] | [[Qweak_Delta]] | ||
+ | [[Qweak_R1_GEM_DNP2009]] | ||
+ | |||
+ | Normalization BPM response structure : https://qweak.jlab.org/elog/Beam/45 | ||
=Hardware= | =Hardware= | ||
+ | |||
+ | Nauvoo: Missouri | ||
+ | |||
+ | Manasseh: 12th tribe | ||
+ | |||
+ | |||
[[Image:QweakGEMlocation_11-29-07.jpg | 200 px]] side view [[Image:QweakGEMlocation_11-29-07_SideView.jpg | 200 px]] | [[Image:QweakGEMlocation_11-29-07.jpg | 200 px]] side view [[Image:QweakGEMlocation_11-29-07_SideView.jpg | 200 px]] | ||
− | [[ | + | [[Qweak_Ionization Chamber]]<br> |
+ | |||
+ | [[Qweak_Readout Electronics]] <br> | ||
+ | |||
+ | [[Qweak_CAEN_HV]] | ||
+ | |||
+ | |||
+ | |||
+ | [[Qweak_Rotator]] | ||
− | |||
− | |||
− | [[ | + | [[Qweak_Collimator]] |
+ | Collimator<br> | ||
+ | |||
+ | Rotator<br> | ||
+ | Ionization Chamber | ||
+ | |||
+ | Readout Electronics | ||
=Software= | =Software= | ||
+ | |||
+ | Qweak online monitoring plots | ||
+ | |||
+ | http://qweak.jlab.org/onlineRegression/autoA/plots/ | ||
+ | |||
+ | |||
+ | [[Qweak_Analysis_Software]] | ||
+ | |||
+ | [[Warren_Parsons_Log_Book]] | ||
[[Qweak_V1495_FPGA_Programming]] | [[Qweak_V1495_FPGA_Programming]] | ||
Line 35: | Line 78: | ||
[[Qweak GEANT3 Monte Carlo]] <br> | [[Qweak GEANT3 Monte Carlo]] <br> | ||
+ | |||
+ | [[Gumstix]] | ||
+ | |||
+ | [[Gumstix_Verdex]] | ||
+ | |||
+ | [[Gumstix_Installation]] | ||
+ | |||
+ | [[Qweak_flipbit]] | ||
=Management = | =Management = | ||
+ | |||
+ | ==Required Shifts== | ||
+ | |||
+ | According to the Qweak shift policy of April 17, 2009: | ||
+ | |||
+ | "Set a goal for shifts to be staffed by institution, based on 30 shifts per collaborator at the | ||
+ | institution, with the expectation that most institutions will provide more than this goal. " | ||
+ | |||
+ | ===Shift weights=== | ||
+ | |||
+ | One “Swing” shift (4pm-midnight) counts as 1.0 shifts: “Day” (8am-4pm) shifts count as 0.8 shifts, and “Owl” shifts | ||
+ | (midnight-8am) count as 1.2 shifts towards the institutional goal. | ||
+ | |||
+ | ===Tforest shifts=== | ||
+ | |||
+ | Sign up using the link below | ||
+ | |||
+ | https://www1.jlab.org/mis/apps/physics/hallCShifts/index.cfm | ||
+ | |||
+ | {| border="1" |cellpadding="20" cellspacing="0 | ||
+ | |colspan= "2" | Qweak shifts taken | ||
+ | |- | ||
+ | | Dates || # of Shifts | ||
+ | |- | ||
+ | |Nov. 21-23, 2010 || 3 | ||
+ | |- | ||
+ | |Dec. 13-17, 2010 || 5 | ||
+ | |- | ||
+ | |Mar. 22-25, 2010 || 4 | ||
+ | |} | ||
+ | |||
+ | Total # of shifts = 12 | ||
+ | Weighted # of shifts = 9.6 | ||
+ | Shifts remaining: 20.4 | ||
+ | |||
+ | 30 shifts are expected | ||
+ | |||
+ | ==Qweak_Installation== | ||
+ | [[Qweak_Installation]] | ||
== Conference Call Number== | == Conference Call Number== | ||
Line 47: | Line 137: | ||
PARTICIPANT CODE: 08935091 | PARTICIPANT CODE: 08935091 | ||
+ | |||
+ | == Qweak thesis topics and students == | ||
+ | |||
+ | http://qweak.jlab.org/doc-private/ShowDocument?docid=527 | ||
[[Qweak_R1_Proj_Management]] | [[Qweak_R1_Proj_Management]] | ||
− | |||
− | |||
=Beam Tests= | =Beam Tests= | ||
Line 65: | Line 157: | ||
5.) Change VFAT threshold to determine dependence on hit pattern ionization radius. | 5.) Change VFAT threshold to determine dependence on hit pattern ionization radius. | ||
+ | |||
[[HRRL_4-13-09]] | [[HRRL_4-13-09]] | ||
+ | |||
+ | =Commissioning= | ||
+ | |||
+ | [[Qweak_Commissioning_6-2010]] | ||
+ | |||
+ | = Talks= | ||
+ | |||
+ | |||
+ | [[DNP_2009_R1_Talk]] | ||
=References= | =References= | ||
[[Qweak Related documents]] | [[Qweak Related documents]] | ||
+ | |||
+ | |||
+ | [https://hallcweb.jlab.org/cameras/R3_Bubblers/index.html R1 Bubbler Camera] | ||
+ | |||
+ | [http://www.jlab.org/~jhlee/nano/ Lee's Log book] | ||
[http://wiki.iac.isu.edu/index.php/User_talk:Tforest Go Back] [[User_talk:Tforest]] | [http://wiki.iac.isu.edu/index.php/User_talk:Tforest Go Back] [[User_talk:Tforest]] |
Latest revision as of 16:25, 2 October 2013
Approved with A rating at JLAB for 198 "PAC" days at 150
A. The current need 223 "PAC" days for 5% measurmentComplete work and be ready for beam before October 20, 2011. Drop Dead date is November 1.
Physics
dDelta letter of intent PAC25 2003
Normalization BPM response structure : https://qweak.jlab.org/elog/Beam/45
Hardware
Nauvoo: Missouri
Manasseh: 12th tribe
Collimator
Rotator
Ionization Chamber
Readout Electronics
Software
Qweak online monitoring plots
http://qweak.jlab.org/onlineRegression/autoA/plots/
Management
Required Shifts
According to the Qweak shift policy of April 17, 2009:
"Set a goal for shifts to be staffed by institution, based on 30 shifts per collaborator at the institution, with the expectation that most institutions will provide more than this goal. "
Shift weights
One “Swing” shift (4pm-midnight) counts as 1.0 shifts: “Day” (8am-4pm) shifts count as 0.8 shifts, and “Owl” shifts (midnight-8am) count as 1.2 shifts towards the institutional goal.
Tforest shifts
Sign up using the link below
https://www1.jlab.org/mis/apps/physics/hallCShifts/index.cfm
Qweak shifts taken | |
Dates | # of Shifts |
Nov. 21-23, 2010 | 3 |
Dec. 13-17, 2010 | 5 |
Mar. 22-25, 2010 | 4 |
Total # of shifts = 12 Weighted # of shifts = 9.6 Shifts remaining: 20.4
30 shifts are expected
Qweak_Installation
Conference Call Number
Domestic Dial In Number: (800) 377-8846
Canada Dial In Number: (888) 276-7715
International Dial In Number (302) 709-8424
PARTICIPANT CODE: 08935091
Qweak thesis topics and students
http://qweak.jlab.org/doc-private/ShowDocument?docid=527
Beam Tests
Readout tasks before beam test.
1.) Use the V1495 to record the VFAT test pattern
2.) create a method of displaying the hit pattern visually
3.) Adjust the VFAT threshold to determine noise level using cosmics, then repeat after installation in the HRRL experimental cell
4.) Determine if there are any clock frequency limitations to operation (too slow/too fast,...)
5.) Change VFAT threshold to determine dependence on hit pattern ionization radius.