Difference between revisions of "12 10 2012 HRRL DetectorTests"
Jump to navigation
Jump to search
Line 24: | Line 24: | ||
There is no Pb around T1. Lets directionally shield Illyusha to determine how much lead to add. | There is no Pb around T1. Lets directionally shield Illyusha to determine how much lead to add. | ||
+ | |||
+ | {| border="1" | ||
+ | | Area || Conditions | ||
+ | |- | ||
+ | |800 \pm 130 pVs|| No shielding | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | |} |
Revision as of 21:00, 19 December 2012
12/12/12
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.
12/13/12
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.
12/14/12
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.
12/19/12
Target T1 goes in and Accelerator side lights up.
There is no Pb around T1. Lets directionally shield Illyusha to determine how much lead to add.
Area | Conditions |
800 \pm 130 pVs | No shielding |
|}