Worked on tuning the beam and evaluating the background
+
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.
 
[[HRRL_Dec_12_2012Run]]
 
[[HRRL_Dec_12_2012Run]]
 
[[File:FC90_121212_A.png | 200 px]]
 
  
 
=12/13/12=
 
=12/13/12=

Revision as of 04:53, 14 December 2012

12/12/12

Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line. HRRL_Dec_12_2012Run

12/13/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.