(Created page with '=9/4/12= Strung 42 Field wires on Sector 5 (now on SL1 - row 152). Strung 48 Sense wires on Sector 6 (now on SL1 - row 189). The Physical Science building at ISU was evacuate…')
 
Line 8: Line 8:
  
 
All wires on S6 were continuity tested. S5 will be tested tomorrow.
 
All wires on S6 were continuity tested. S5 will be tested tomorrow.
 +
 +
 +
=9/5/12=
 +
 +
Strung 63 Field wires on Sector 5 (now on SL1 - row 161). Removed pretensioner C5 at row 160.
 +
 +
Strung 48 Sense wires on Sector 6 (now on SL1 - row 205).
 +
 +
 +
=9/6/12=

Revision as of 23:29, 6 September 2012

9/4/12

Strung 42 Field wires on Sector 5 (now on SL1 - row 152).

Strung 48 Sense wires on Sector 6 (now on SL1 - row 189).

The Physical Science building at ISU was evacuated at approximately 1pm by the fire and police departments after someone reported the smell of natural gas. A HAZMAT team was called in and the cause was found to be gases produced in a hood in the Chemistry Department. The hood had malfunctioned. We were evacuated until 5pm.

All wires on S6 were continuity tested. S5 will be tested tomorrow.


9/5/12

Strung 63 Field wires on Sector 5 (now on SL1 - row 161). Removed pretensioner C5 at row 160.

Strung 48 Sense wires on Sector 6 (now on SL1 - row 205).


9/6/12