(Created page with '=9/4/12= Strung 42 Field wires on Sector 5 (now on SL1 - row 152). Strung 48 Sense wires on Sector 6 (now on SL1 - row 189). The Physical Science building at ISU was evacuate…') |
(→9/4/12) |
||
Line 8: | Line 8: | ||
All wires on S6 were continuity tested. S5 will be tested tomorrow. | All wires on S6 were continuity tested. S5 will be tested tomorrow. | ||
+ | |||
+ | |||
+ | =9/5/12= | ||
+ | |||
+ | Strung 63 Field wires on Sector 5 (now on SL1 - row 161). Removed pretensioner C5 at row 160. | ||
+ | |||
+ | Strung 48 Sense wires on Sector 6 (now on SL1 - row 205). | ||
+ | |||
+ | |||
+ | =9/6/12= |
Revision as of 23:29, 6 September 2012
9/4/12
Strung 42 Field wires on Sector 5 (now on SL1 - row 152).
Strung 48 Sense wires on Sector 6 (now on SL1 - row 189).
The Physical Science building at ISU was evacuated at approximately 1pm by the fire and police departments after someone reported the smell of natural gas. A HAZMAT team was called in and the cause was found to be gases produced in a hood in the Chemistry Department. The hood had malfunctioned. We were evacuated until 5pm.
All wires on S6 were continuity tested. S5 will be tested tomorrow.
9/5/12
Strung 63 Field wires on Sector 5 (now on SL1 - row 161). Removed pretensioner C5 at row 160.
Strung 48 Sense wires on Sector 6 (now on SL1 - row 205).