Difference between revisions of "Runs 4111(D2O)/4112(H2O)"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
Errors on the neutron energy for the case of Det M: | Errors on the neutron energy for the case of Det M: | ||
− | <math>E_n \pm U(E_n)=mc^2/2 \cdot 1/c^2 \cdot (l_n/t_n)^2 \cdot [1 \pm 2 \sqrt{U^2(l_n)/l^2_n + U^2(t_n)/t^2_n} </math> | + | <math>E_n \pm U(E_n)=mc^2/2 \cdot 1/c^2 \cdot (l_n/t_n)^2 \cdot [1 \pm 2 \sqrt{U^2(l_n)/l^2_n + U^2(t_n)/t^2_n}]</math> |
+ | |||
+ | Where <math>U(l_n) = 14.8/2 \cdot cos(\theta)</math> and <math>U(t_n)=10 ns</math> |
Revision as of 22:48, 3 September 2012
Subtraction of the stops for each detector in the case of D2O target. The length of the active area (scintillator) of the detector is 75.3 cm.
Subtraction of the stops for each detector in the case of H2O target:
Normalized superimposed timing spectra from D2O(black line)/H2O(red line) targets and bin-by-bin subtraction (green line) of D2O-H2O data:
Neutron energy distribution data analysis for run 4111:
Errors on the neutron energy for the case of Det M:
Where
and