Difference between revisions of "HRRL Positrons Jul 2012 Runs Setup"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with '= ADC inputs = Detector Left -> CH6 Detector Left -> CH6')
 
Line 3: Line 3:
 
Detector Left -> CH6
 
Detector Left -> CH6
  
Detector Left -> CH6
+
Detector Right -> CH5
 +
 
 +
Beam left Scintillator (between Q9 and Q10)-> CH9
 +
 
 +
Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2.
 +
 
 +
Battery -> CH13.
 +
 
 +
Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded.

Revision as of 18:08, 30 July 2012

ADC inputs

Detector Left -> CH6

Detector Right -> CH5

Beam left Scintillator (between Q9 and Q10)-> CH9

Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2.

Battery -> CH13.

Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded.