Difference between revisions of "HRRL Positrons Jul 2012 Runs Setup"
Jump to navigation
Jump to search
(Created page with '= ADC inputs = Detector Left -> CH6 Detector Left -> CH6') |
|||
Line 3: | Line 3: | ||
Detector Left -> CH6 | Detector Left -> CH6 | ||
− | Detector | + | Detector Right -> CH5 |
+ | |||
+ | Beam left Scintillator (between Q9 and Q10)-> CH9 | ||
+ | |||
+ | Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2. | ||
+ | |||
+ | Battery -> CH13. | ||
+ | |||
+ | Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded. |
Revision as of 18:08, 30 July 2012
ADC inputs
Detector Left -> CH6
Detector Right -> CH5
Beam left Scintillator (between Q9 and Q10)-> CH9
Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2.
Battery -> CH13.
Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded.