Difference between revisions of "Beam Test Jul 27 2012"
Jump to navigation
Jump to search
(Created page with '==Beam Current Calibration of Scint Left== Determine if the Beam Left Scintillator is linear with beam current. {| border="1" |cellpadding="20" cellspacing="0 |- | run# ||…') |
|||
| Line 1: | Line 1: | ||
| − | ==Beam Current Calibration of Scint Left | + | = Tune = |
| + | {| border="1" | ||
| + | | Energy Switch || Out (High En) | ||
| + | |- | ||
| + | | Solenoid 1 || 13.9 A | ||
| + | |- | ||
| + | | Solenoid 2 || 4.1 A | ||
| + | |- | ||
| + | | Gun Hor || -0 A | ||
| + | |- | ||
| + | | Gun Ver || +0.2 A | ||
| + | |- | ||
| + | |Output Hor || -0.3 A | ||
| + | |- | ||
| + | | Output Ver || -0 A | ||
| + | |- | ||
| + | | Rep Rate || 17 | ||
| + | |- | ||
| + | | Gun HV || 10 (Knob Setting) | ||
| + | |- | ||
| + | | Gun Grid Voltage || 10 (Knob Setting) | ||
| + | |- | ||
| + | | RF frequency ||2856.321 MHz | ||
| + | |- | ||
| + | | Modulator HV Power Supply || 4.19 (Knob Setting) | ||
| + | |- | ||
| + | | RF macro Pulse Length (FWHM) || 300 ns | ||
| + | |- | ||
| + | |Q1 (A)|| -3 | ||
| + | |- | ||
| + | |Q2 (A)|| +0.8 | ||
| + | |- | ||
| + | |Q3 (A)|| +2 | ||
| + | |- | ||
| + | |Q4 (A)|| 0 | ||
| + | |- | ||
| + | |Q5 (A)|| 0 | ||
| + | |- | ||
| + | |Q6 (A)|| 0 | ||
| + | |- | ||
| + | | Current at FC0 || 96 mA | ||
| + | |} | ||
| + | |||
| + | |||
| + | =Beam Current Calibration of Scint Left= | ||
Determine if the Beam Left Scintillator is linear with beam current. | Determine if the Beam Left Scintillator is linear with beam current. | ||
Revision as of 14:05, 27 July 2012
Tune
| Energy Switch | Out (High En) |
| Solenoid 1 | 13.9 A |
| Solenoid 2 | 4.1 A |
| Gun Hor | -0 A |
| Gun Ver | +0.2 A |
| Output Hor | -0.3 A |
| Output Ver | -0 A |
| Rep Rate | 17 |
| Gun HV | 10 (Knob Setting) |
| Gun Grid Voltage | 10 (Knob Setting) |
| RF frequency | 2856.321 MHz |
| Modulator HV Power Supply | 4.19 (Knob Setting) |
| RF macro Pulse Length (FWHM) | 300 ns |
| Q1 (A) | -3 |
| Q2 (A) | +0.8 |
| Q3 (A) | +2 |
| Q4 (A) | 0 |
| Q5 (A) | 0 |
| Q6 (A) | 0 |
| Current at FC0 | 96 mA |
Beam Current Calibration of Scint Left
Determine if the Beam Left Scintillator is linear with beam current.
| run# | FC1 | Scint Left (Ch9) | Reprate | start | stop | Int Rate | comments |
| 3696 | 2335 | 17:30:08 | 17:31:39 ( s) | 11 events/s | first measurement at full current | ||
| 3697 | 59 | 17:: | 17:: ( s) | events/s | cut the current in half | ||
| 3698 | 17:: | 17:: ( s) | events/s | ||||
| 3699 | 100 px | 17:: | 17:: ( s) | events/s |
1. T1 out, disable D1, send the beam to FC0, take scope image of the area.
2. T1 in, enable D1, bend the beam by 90 deg, take a run with 1000 events.