Difference between revisions of "Beam Test Jul 25 2012"
Jump to navigation
Jump to search
(Created page with '= Tune = {| border="1" | Energy Switch || Out (High En) |- | Solenoid 1 || 9.1 A |- | Solenoid 2 || 1.3 A |- | Gun Hor || -0 A |- | Gun Ver || +0…') |
(→Tune) |
||
| Line 41: | Line 41: | ||
| Current at FC0 || 90 mA | | Current at FC0 || 90 mA | ||
|} | |} | ||
| + | |||
| + | |||
| + | quad settings after T1 (Target 1, positron production target). | ||
| + | D1 D2 q4 q5 q6 q7 q8 q9 q10 | ||
| + | 4.2 4.41 +6.5 -3.7 -1.1 +1.5 +0.2 +0.3 +0.0 | ||
Revision as of 14:37, 25 July 2012
Tune
| Energy Switch | Out (High En) |
| Solenoid 1 | 9.1 A |
| Solenoid 2 | 1.3 A |
| Gun Hor | -0 A |
| Gun Ver | +0.1 A |
| Output Hor | -0.3 A |
| Output Ver | -0 A |
| Rep Rate | 11 |
| Gun HV | 10 (Knob Setting) |
| Gun Grid Voltage | 10 (Knob Setting) |
| RF frequency | 2856.323 MHz |
| Modulator HV Power Supply | 4.19 (Knob Setting) |
| RF macro Pulse Length (FWHM) | 300 ns |
| Q1 (A) | -3 |
| Q2 (A) | +0.8 |
| Q3 (A) | +2 |
| Q4 (A) | -2 |
| Q5 (A) | +0.8 |
| Q6 (A) | +2 |
| Current at FC0 | 90 mA |
quad settings after T1 (Target 1, positron production target).
D1 D2 q4 q5 q6 q7 q8 q9 q10 4.2 4.41 +6.5 -3.7 -1.1 +1.5 +0.2 +0.3 +0.0