Difference between revisions of "Beam Test Jul 25 2012"
Jump to navigation
Jump to search
(Created page with '= Tune = {| border="1" | Energy Switch || Out (High En) |- | Solenoid 1 || 9.1 A |- | Solenoid 2 || 1.3 A |- | Gun Hor || -0 A |- | Gun Ver || +0…') |
(→Tune) |
||
Line 41: | Line 41: | ||
| Current at FC0 || 90 mA | | Current at FC0 || 90 mA | ||
|} | |} | ||
+ | |||
+ | |||
+ | quad settings after T1 (Target 1, positron production target). | ||
+ | D1 D2 q4 q5 q6 q7 q8 q9 q10 | ||
+ | 4.2 4.41 +6.5 -3.7 -1.1 +1.5 +0.2 +0.3 +0.0 |
Revision as of 14:37, 25 July 2012
Tune
Energy Switch | Out (High En) |
Solenoid 1 | 9.1 A |
Solenoid 2 | 1.3 A |
Gun Hor | -0 A |
Gun Ver | +0.1 A |
Output Hor | -0.3 A |
Output Ver | -0 A |
Rep Rate | 11 |
Gun HV | 10 (Knob Setting) |
Gun Grid Voltage | 10 (Knob Setting) |
RF frequency | 2856.323 MHz |
Modulator HV Power Supply | 4.19 (Knob Setting) |
RF macro Pulse Length (FWHM) | 300 ns |
Q1 (A) | -3 |
Q2 (A) | +0.8 |
Q3 (A) | +2 |
Q4 (A) | -2 |
Q5 (A) | +0.8 |
Q6 (A) | +2 |
Current at FC0 | 90 mA |
quad settings after T1 (Target 1, positron production target).
D1 D2 q4 q5 q6 q7 q8 q9 q10 4.2 4.41 +6.5 -3.7 -1.1 +1.5 +0.2 +0.3 +0.0