Difference between revisions of "Beam Test Jul 24 2012"

From New IAC Wiki
Jump to navigation Jump to search
Line 45: Line 45:
  
 
  run# Source HV-DL HV-DR Pulser-period start-time end-time
 
  run# Source HV-DL HV-DR Pulser-period start-time end-time
  3536 Na-22 1082V 1223V 20 micro-sec  19:01:34  19:58:29
+
  3553 Na-22 1082V 1223V 20 micro-sec  19:01:34  19:58:29
  3537 Na-22 1082V 1223V 5  micro-sec
+
  3554 Na-22 1082V 1223V 5  micro-sec  20:00:50  20:11:32
 +
3557  Na-22 1082V 1223V 10 micro-sec 
 +
3558  Na-22 1082V 1223V 10 micro-sec 
 +
3559  Na-22 1150V 1150V 10 micro-sec

Revision as of 02:52, 25 July 2012

Energy Switch Out (High En)
Solenoid 1 6.7 A
Solenoid 2 1.5 A
Gun Hor +0.3 A
Gun Ver -0 A
Output Hor -0.4 A
Output Ver +0 A
Rep Rate 11
Gun HV 10 (Knob Setting)
Gun Grid Voltage 2.85 (Knob Setting)
RF frequency 2856.243 MHz
Modulator HV Power Supply 4.19 (Knob Setting)
RF macro Pulse Length (FWHM) 300 ns
Q1 (A) -2
Q2 (A) +0.8
Q3 (A) +2
Q4 (A) -2
Q5 (A) +0.8
Q6 (A) +2
Current at FC0 32 mA

Calibration runs with sources

run# Source HV-DL HV-DR Pulser-period start-time end-time
3553  Na-22 1082V 1223V 20 micro-sec  19:01:34   19:58:29
3554  Na-22 1082V 1223V 5  micro-sec  20:00:50   20:11:32
3557  Na-22 1082V 1223V 10 micro-sec  
3558  Na-22 1082V 1223V 10 micro-sec  
3559  Na-22 1150V 1150V 10 micro-sec