Difference between revisions of "Beam Test Jul 24 2012"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
| − | |||
{| border="1" | {| border="1" | ||
| Energy Switch || Out (High En) | | Energy Switch || Out (High En) | ||
| Line 41: | Line 40: | ||
| Current at FC0 || 32 mA | | Current at FC0 || 32 mA | ||
|} | |} | ||
| + | |||
| + | = Calibration runs with sources = | ||
| + | |||
| + | |||
| + | run# Source HV-DL HV-DR Pulser-period start-time end-time | ||
| + | 3536 Na-22 1082V 1223V 20 micro-sec 19:01:34 19:58:29 | ||
| + | 3537 Na-22 1082V 1223V 5 micro-sec | ||
Revision as of 02:00, 25 July 2012
| Energy Switch | Out (High En) |
| Solenoid 1 | 6.7 A |
| Solenoid 2 | 1.5 A |
| Gun Hor | +0.3 A |
| Gun Ver | -0 A |
| Output Hor | -0.4 A |
| Output Ver | +0 A |
| Rep Rate | 11 |
| Gun HV | 10 (Knob Setting) |
| Gun Grid Voltage | 2.85 (Knob Setting) |
| RF frequency | 2856.243 MHz |
| Modulator HV Power Supply | 4.19 (Knob Setting) |
| RF macro Pulse Length (FWHM) | 300 ns |
| Q1 (A) | -2 |
| Q2 (A) | +0.8 |
| Q3 (A) | +2 |
| Q4 (A) | -2 |
| Q5 (A) | +0.8 |
| Q6 (A) | +2 |
| Current at FC0 | 32 mA |
Calibration runs with sources
run# Source HV-DL HV-DR Pulser-period start-time end-time 3536 Na-22 1082V 1223V 20 micro-sec 19:01:34 19:58:29 3537 Na-22 1082V 1223V 5 micro-sec