Difference between revisions of "2013 MRI CLAS12 LeveL2Trig"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | =Concept | + | =Concept= |
Replace the existing drift chamber electronics with an FPGA based system which will allow fast track finding to facilitate a Level 2 trigger. | Replace the existing drift chamber electronics with an FPGA based system which will allow fast track finding to facilitate a Level 2 trigger. | ||
Line 8: | Line 8: | ||
http://www.nsf.gov/funding/pgm_summ.jsp?pims_id=5260 | http://www.nsf.gov/funding/pgm_summ.jsp?pims_id=5260 | ||
− | =Collaborators= | + | =Collaborators and Roles= |
==Build electronics== | ==Build electronics== | ||
Line 21: | Line 21: | ||
Dave Heddle | Dave Heddle | ||
C. Salgado | C. Salgado | ||
+ | |||
+ | ==Hardware Tests== | ||
+ | |||
+ | T. Forest (ISU) | ||
+ | |||
+ | =Proposal= |
Latest revision as of 20:39, 24 July 2012
Concept
Replace the existing drift chamber electronics with an FPGA based system which will allow fast track finding to facilitate a Level 2 trigger.
Solicitation
http://www.nsf.gov/funding/pgm_summ.jsp?pims_id=5260
Collaborators and Roles
Build electronics
JLab
Physics motivation
K. Hicks L. Guo (FIU)
Program FPGAs
Dave Heddle C. Salgado
Hardware Tests
T. Forest (ISU)