Difference between revisions of "Beam Test Jul 17 2012"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | |||
+ | = Tune = | ||
+ | |||
+ | Used tune from yesterday. | ||
+ | |||
+ | {| border="1" | ||
+ | | Energy Switch || Out (High En) | ||
+ | |- | ||
+ | | Solenoid 1 || 6.9 A | ||
+ | |- | ||
+ | | Solenoid 2 || 1.3 A | ||
+ | |- | ||
+ | | Gun Hor || 0 A | ||
+ | |- | ||
+ | | Gun Ver || +0.2 A | ||
+ | |- | ||
+ | |Output Hor || +1.2 A | ||
+ | |- | ||
+ | | Output Ver || 0 A | ||
+ | |- | ||
+ | | Rep Rate || 8 | ||
+ | |- | ||
+ | | Gun HV || 10 (Knob Setting) | ||
+ | |- | ||
+ | | Gun Grid Voltage || 6.42 (Knob Setting) | ||
+ | |- | ||
+ | | RF frequency ||2856.320 MHz | ||
+ | |- | ||
+ | | Modulator HV Power Supply || 4.28 (Knob Setting) | ||
+ | |- | ||
+ | | RF macro Pulse Length (FWHM) || 300 ns | ||
+ | |- | ||
+ | |Q1 (A)|| -10 | ||
+ | |- | ||
+ | |Q2 (A)|| -10 | ||
+ | |- | ||
+ | |Q3 (A)|| 0 | ||
+ | |- | ||
+ | |} | ||
= 3 MeV tests = | = 3 MeV tests = | ||
+ | |||
+ | |||
+ | |||
{| border="1" | {| border="1" |
Revision as of 14:18, 17 July 2012
Tune
Used tune from yesterday.
Energy Switch | Out (High En) |
Solenoid 1 | 6.9 A |
Solenoid 2 | 1.3 A |
Gun Hor | 0 A |
Gun Ver | +0.2 A |
Output Hor | +1.2 A |
Output Ver | 0 A |
Rep Rate | 8 |
Gun HV | 10 (Knob Setting) |
Gun Grid Voltage | 6.42 (Knob Setting) |
RF frequency | 2856.320 MHz |
Modulator HV Power Supply | 4.28 (Knob Setting) |
RF macro Pulse Length (FWHM) | 300 ns |
Q1 (A) | -10 |
Q2 (A) | -10 |
Q3 (A) | 0 |
3 MeV tests
W1 | Sweeping magnet | D1 (A) | D2 (A) | Mode | Jaw width (cm) | q4 (A) | q5 (A) | q6 (A) | q7 (A) | q8 (A) | q9 (A) | q10 (A) | Counts | Time (s) | counts/second | conditions |
in | out | -5.8 | 0 | photon | 0.2 | - 2 | +2 | 0 | 0 | 0 | -0.6 | - 0.4 | D1 tuned for 3 Mev, D2 tuned for 3 MeV | |||
in | out | -5.8 | -5.8 | positron | 0.2 | - 2 | +2 | 0 | 0 | 0 | -0.6 | - 0.4 | D1 tuned for 3 Mev, D2 tuned for 3 MeV |